Laserfiche WebLink
BELSAA <br />8c <br />SMITH <br />BELSASC0330H <br />December 1st, 2025 <br />Re: Structural Steel Update COP #23Rev 4 <br />P.O. BOX 926 / 103 EAST 4T" AVE, SUITE 209 <br />ELLENSBURG, WA 98926 <br />509-925-9747 <br />brandon@beismith.com <br />Per the description below, we present the following change order proposal #23 (COP#23). <br />COP#23 encompasses all the changes made to the transfer station push wall and hopper <br />captured in RFI# 46,47, and 48. These cost increases reflect changes in shop fabrication, added <br />time for onsite welding, additional materials, and added drafting time. <br />Total Cost Added to Contract: <br />Time extension required: 5 days <br />Sincerely, <br />Riley Eres, <br />Belsaas & Smith Construction <br />$56,855.63 + WSST <br />