Laserfiche WebLink
Kittitas County Solid Waste <br />925 Industrial Way <br />Ellensburg, WA 98926 <br />January 9, 2026 <br />Belsaas and Smith Construction <br />103 East 4`h Avenue, Suite 209 <br />Ellensburg, WA 98926 <br />Project: Lower Valley Transfer, Change Order No. 12 <br />Mr. Nelson, <br />I am writing to formally acknowledge and award change order number 12 for the following Change <br />Order Proposals (COP): <br />COP #23R: Structural Steel Revisions $56,855.63 <br />COP #39: Pond Changes $49,259.37 <br />COP #49: Fire suppression electrical $1967.17 <br />COP #57: Misting pump circuit $827.51 <br />COP #58: Louver $2028.59 <br />COP #61: Transfer Station Compressor Electrical $1860.23 <br />COP #62: Light Shades and dimmers $29,501.93 <br />Change Order No. 12 Total $142,300.43 <br />Base Bid and Additive A2 <br />$18,441,939.80 <br />Additive Al <br />$642,000.00 <br />Change Order No. 2 <br /><$11,754.08> <br />Change Order No. 3 <br /><$28,041.41> <br />Change Order No. 4 <br />$145,224.93 <br />Change Order No. 5 <br />$233,662.44 <br />Change Order No. 6 <br /><$24,051.84> <br />Change Order No. 7 <br />$96,439.74 <br />Change Order No. 8 <br />$104,401.24 <br />Change Order No. 9 <br />$127,737.00 <br />Change Order No. 10 <br />$46,392.94 <br />Change Order No. 11 <br />$49,209.69 <br />Change Order No. 12 <br />$142.300.43 <br />Subtotal $19,965,460.88 <br />WSST $1,717,029.64 <br />