My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-01-13-minutes-solid-waste-and-maintenance
>
Meetings
>
2026
>
03. March
>
2026-03-03 10:00 AM - Commissioners' Agenda
>
2026-01-13-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2026 1:46:28 PM
Creation date
2/26/2026 1:27:11 PM
Metadata
Fields
Template:
Meeting
Date
3/3/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
142099
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lam: <br />TITAN <br />2:5 14e,,5 Rd, ��2'Xima. 4IA.'9330 <br />S09.941.8306 111 ANEL877RG <br />TO: Riley Eres <br />Contractor Belsaas & Smith Construction <br />FROM: Adam Rieker <br />Subcontractor Titan Electrical LLC <br />Project: Lower Valley Transfer Station <br />2603 Green Ave <br />Ellensburg, WA 98926 <br />Subcontract# <br />Date: <br />10/8/2025 <br />Change # <br />14 <br />Amount: <br />$10,492.36 <br />Initiated By: <br />Titan Electrical <br />Reason: <br />Design Change <br />Type: <br />Additive - Lump Sum <br />CHANGE TITLE I MRW Exterior Lighting Alternate Option <br />THIS CONTRACT WILL BE MODIFIED AS FOLLOWS: <br />Per RFI 047, the exterior lighting fixtures on the MRW building will no longer be installed and instead high <br />bay light fixtures and BLD fixtures will be used. However, this cost includes an alternative option instead <br />of using the BLD fixtures. The cost includes the installation of (4) high bay light fixtures on the north <br />overhang of the MRW building as well as (5) WP3 fixtures total, with two being on the west wall, two on <br />the south wall, and one on the east wall. The cost includes the fixtures as well as materials for <br />installation, including fittings, conduit, boxes, etc. <br />Credit Breakdown This Change: <br />Labor <br />$4,873.70 <br />Material <br />$3,869.94 <br />Other <br />O&P <br />$1,748.72 <br />Total <br />$10,492.36 <br />Authorized By: <br />Signature: <br />Print Name: <br />Title: <br />Date: <br />Titan Electrical LLC <br />SUBCONTRACTOR <br />Adam Rieker <br />Project Manager <br />10/8/2025 <br />Accepted By: <br />Signature: <br />Print Name: <br />Title: <br />Date: <br />CONTRACTOR <br />Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.