Laserfiche WebLink
215 Keys IRC. YaV1n12, :1A 98901 <br />509.941 Z,106 I rI ANLL877RD <br />TO: Riley Eres <br />Contractor Belsaas & Smith Construction <br />FROM: Adam Rieker <br />Subcontractor Titan Electrical LLC <br />CHANGE TITLE I MRW Exterior Lighting <br />THIS CONTRACT WILL BE MODIFIED AS FOLLOWS: <br />Project: Lower Valley Transfer Station <br />2603 Green Ave <br />Ellensburg, WA 98926 <br />Subcontract # <br />Date: <br />10/8/2025 <br />Change # <br />13 <br />Amount: <br />$13,779.75 <br />Initiated By: <br />Titan Electrical <br />Reason: <br />Design Change <br />Type: <br />Additive - Lump Sum <br />Per RFI 047, the exterior lighting fixtures on the MRW building will no longer be installed and instead high <br />bay light fixtures and BLD fixtures will be used. The cost includes the installation of (4) high bay light <br />fixtures on the north overhang of the MRW building as well as (3) BLD fixtures total, with two being on <br />the west wall and one on the east. The cost includes the fixtures as well as materials for installation, <br />including fittings, conduit, boxes, etc. <br />Credit Breakdown This Change: <br />Labor <br />$4,125.05 <br />Material <br />$7,358.08 <br />Other <br />O&P <br />$2,296.62 <br />Total <br />$13,779.75 <br />Authorized By: Titan Electrical LLC Accepted By: <br />Signature: <br />Print Name: <br />SUBCONTRACTOR <br />Adam Rieker <br />Signature: <br />Print Name: <br />Title: Project Manager Title: <br />Date: 10/8/2025 Date: <br />Page 1 of 1 <br />CONTRACTOR <br />