My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-01-13-minutes-solid-waste-and-maintenance
>
Meetings
>
2026
>
03. March
>
2026-03-03 10:00 AM - Commissioners' Agenda
>
2026-01-13-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2026 1:46:28 PM
Creation date
2/26/2026 1:27:11 PM
Metadata
Fields
Template:
Meeting
Date
3/3/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
142099
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TITAN <br />I =4 M1 �4w% d : I = <br />771V23,5 Kcys Rd, YaRin18, VVA 98901 <br />509.941.'r�'106 1I I/i\I[ L87r! G <br />TO: Riley Eres <br />Contractor Belsaas & Smith Construction <br />FROM: Adam Rieker <br />Subcontractor Titan Electrical LLC <br />CHANGE TITLE I MRW Exterior Lighting Credit <br />THIS CONTRACT WILL BE MODIFIED AS FOLLOWS: <br />Project: Lower Valley Transfer Station <br />2603 Green Ave <br />Ellensburg, WA 98926 <br />Subcontract # <br />Date: <br />10/8/2025 <br />Change # <br />10 <br />Amount: <br />$5,487.96 <br />Initiated By: <br />Titan Electrical <br />Reason: <br />Design Change <br />Type: <br />Deductive - Lump Sum <br />Per RFI 047, the exterior lighting fixtures on the MRW building will no longer be installed. A credit is being <br />provided from the original scope for the installation of (16) wall mounted fixtures, including fittings, <br />conduit, boxes, etc. The credit does not include the cost of the (16) fixtures themselves as these were <br />non -returnable items. <br />Credit Breakdown This Change: <br />Labor <br />($4,073.30) <br />Material <br />($500.00) <br />Other <br />O&P <br />($914.66) <br />Total <br />($5,487.96) <br />Authorized By: <br />Signature: <br />Print Name: <br />Title: <br />Date: <br />Titan Electrical LLC <br />SUBCONTRACTOR <br />Adam Rieker <br />Project Manager <br />10/8/2025 <br />Accepted By: <br />Signature: <br />Print Name: <br />Title: <br />Date: <br />CONTRACTOR <br />Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.