My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-01-13-minutes-solid-waste-and-maintenance
>
Meetings
>
2026
>
03. March
>
2026-03-03 10:00 AM - Commissioners' Agenda
>
2026-01-13-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2026 1:46:28 PM
Creation date
2/26/2026 1:27:11 PM
Metadata
Fields
Template:
Meeting
Date
3/3/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
142099
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BELSAA <br />SMITH <br />BELSASC0330H <br />October 14, 2025 <br />Re: Replacement of MRW Exterior Surface Mounted Lighting <br />P.O. BOX 926 / 103 EAST 4T" AVE, SUITE 209 <br />ELLENSBURG, WA 98926 <br />509-925-9747 FAX: 509-962-3031 <br />brandon@belsmith.com <br />Per the description below, we present the following change order proposal #46 (COP#46). <br />We are submitting this Change Order Proposal (COP) for your review and approval. This COP <br />addresses a required change to the originally specified exterior lighting fixtures at the MRW. <br />During coordination and procurement, it was identified that the originally planned fixtures had <br />an excessively high lumen output and were significantly heavier than what is practical for the <br />mounting conditions. The current fixtures present concerns related to structural loading, <br />installation feasibility, and appropriate lighting levels for the space. <br />To resolve this issue, two options have been developed and are outlined below for your <br />consideration. <br />Option A— Engineers Revised Design <br />$10,050.71 + WSST <br />Option B — Electrical Contractors Recommendation $6,270.23 + WSST <br />Time extension required: 10 days <br />Sincerely, <br />i <br />Riley Eres, <br />Belsaas & Smith Construction <br />
The URL can be used to link to this page
Your browser does not support the video tag.