Laserfiche WebLink
215 Keys Rd <br />W"Irlar^M Yakima, WA 98901 PCO #009 <br />509-941-8306 1 1 <br />Lower Vallev Transfer Station <br />Date: <br />8/4/2025 <br />Days Allowed for Response: <br />10 <br />To: <br />Riley Eres <br />Requested Response Date: <br />From: <br />Adam Rieker <br />Sent VIA: <br />Email <br />IAction Notes: Service Entrance Potential Cost I <br />I Potential Time <br />Spec <br />bection/ i me: 1 <br />Cost includes six runs of four 600MCM AL XHHW conductors for the service entrance conductors from the utility <br />transformer. Each run is SO feet long plus the required 6 feet of make up length, per utility requirements. Total wire <br />length is 1,344 feet. <br />Materials: $7,495.34 <br />Labor: $8,577.85 <br />OH&P: $3,214-64 <br />TOTAL COST - $19,287.83 <br />Response: <br />Answered By: Response Date: <br />Distribution of Response <br />Copies <br />Sent Via <br />I By: <br />Field File <br />Project File <br />