My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-01-13-minutes-solid-waste-and-maintenance
>
Meetings
>
2026
>
03. March
>
2026-03-03 10:00 AM - Commissioners' Agenda
>
2026-01-13-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2026 1:46:28 PM
Creation date
2/26/2026 1:27:11 PM
Metadata
Fields
Template:
Meeting
Date
3/3/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
142099
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BELSAA <br />8i <br />SMITH <br />BELSASC0330H <br />September 8, 2025 <br />Re: Recycling center ramps <br />P.O. BOX 926 / 103 EAST 4TH AVE, SUITE 209 <br />ELLENSBURG, WA 98926 <br />509-925-9747 FAX: 509-962-3031 <br />riley@belsmith.com <br />Per the description below, we present the following change order proposal #36111 (COP#36R1). <br />Following the County's guidance on Submittal #100 concerning the modular ramp system, we <br />have revised the design detailed on sheet C19 to address the previously identified deficiencies. <br />Specifically: <br />1. Loading Dock Extension <br />o Added an additional 18 feet of full -height loading area to ensure proper <br />accommodation and functionality for all users. <br />2. Exit Staircase Installation <br />o Incorporated a dedicated exit staircase to facilitate safe and efficient egress for <br />able-bodied customers. <br />3. Revised System 2 <br />o System 2 is a smaller non-ADA compliant system to give access to able bodied <br />customers. This system also save costs compared to two full ADA systems shown <br />in the original bid documents. <br />This updated proposal encompasses all necessary labor and materials to furnish and install two <br />fully compliant modular ramp systems. <br />Total Cost added to contract: $18,694.32+ WSST <br />Time extension required: 0 days <br />Sincerely, <br />Riley Eres, <br />Belsaas & Smith Construction <br />
The URL can be used to link to this page
Your browser does not support the video tag.