Laserfiche WebLink
Kittitas County Detention Center <br />4.2 ELECTRICAL END -USE DISTRIBUTION <br />Table 4-2 and Figure 4-1 present the electrical end -use breakdown. <br />Table 4-2 Electrical End -Use <br />Category <br />Percent Use <br />Energy Use <br />(kWh/ ) <br />Cost ($/yr) <br />Space Heating <br />5 <br />74,133 <br />$5,567.39 <br />Lighting <br />16.7 <br />225,916 <br />$16,966.32 <br />Air Distribution <br />21.2 <br />286,792 <br />$21,538.08 <br />Space Cooling <br />25.3 <br />342,257 <br />$25,703.47 <br />Refrigeration <br />4.1 <br />55,465 <br />$4,165.38 <br />Water Heating <br />4.1 <br />55,465 <br />$4,165.38 <br />Cooking <br />1.4 <br />18,939 <br />$1,422.33 <br />Office Equipment <br />1 <br />18,939 <br />$1,422.33 <br />Computing <br />6 <br />74,404 <br />$5,587.71 <br />Other <br />15 <br />202,919 <br />$15,239.21 <br />Office Equip <br />18,939 <br />Cooking. <br />18,939 <br />Water Heati <br />55,465 <br />Refrigeratioi <br />55,465 <br />Figure 4-1 Electrical End -Use (kWh/yr) <br />Other Space Heating <br />,?m 414 <br />74,133 <br />Space Cooling <br />342,257 <br />Jr Distribution <br />286,792 <br />Project Number 22-084 20 <br />October 28, 2025 <br />