My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-01-13-minutes-solid-waste-and-maintenance
>
Meetings
>
2026
>
03. March
>
2026-03-03 10:00 AM - Commissioners' Agenda
>
2026-01-13-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2026 1:46:28 PM
Creation date
2/26/2026 1:27:11 PM
Metadata
Fields
Template:
Meeting
Date
3/3/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
142099
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kittitas County Detention Center <br />Figure 3-2 White Roll Roofing <br />3.2 MECHANICAL SYSTEMS <br />3.2.1 Heating, Ventilation, and Air Conditioning Systems <br />The detention center annex is serviced by a roof -mounted heat recovery unit (HRU) (see Figure <br />3-3) with three supply ducts: one gas -fired and heated in three stages, one neutral, and one <br />cooled duct. The HRU is scheduled to be replaced with the pending detention center upgrades. <br />The detention center is serviced by two air handling units (AHU) in the basement (see Figure 3- <br />4). The detention center chilled water is supplied by pumps (see Figure 3-5) and an air-cooled <br />chiller (see Figure 3-6). The detention center is supplied by three Rheem 120-gallon, 400 MBTU <br />heating water boilers installed in 2017 in the basement, all in good condition. The annex is served <br />by two AO Smith 120-gallon, 300 MBTU heating water boilers, both in good condition. The <br />detention center is fully integrated into a Building Automation System (BAS); however, it is not <br />set up for optimal performance. The detention center electrical service also feeds the four rooftop <br />AHUs serving the second floor of the courthouse. Any work done to improve energy usage of <br />the courthouse AHUs will lead to a reduction in the detention center's energy consumption. <br />Project Number 22-084 <br />October 28, 2025 <br />
The URL can be used to link to this page
Your browser does not support the video tag.