Laserfiche WebLink
Figure 7 - Lighting Schedule <br />Basement Kitchen, 8468 <br />Admin <br />First Floor Admin, 8468 <br />Detention <br />First Floor Detention 6678 <br />Expansion <br />Second Floor Detention 8468 <br />Second Floor Detention 3374 <br />Expansion <br />Exterior Exterior 636 <br />SIGNATURE <br />10585 1 0.8 <br />10585 <br />8942 <br />10585 <br />0.8 <br />0.75 <br />0.8 <br />3949 <br />0.85 <br />N/A <br />N/A <br />Figure 8 - Lighting EEM Annual Savings <br />5.1.4: The building owner has reviewed and signed the energy management plan annually. <br />This plan was prepared by Akana for Patti Stacey of Kittitas County to demonstrate compliance <br />with Tier 2 covered building reporting requirements of the Washington State Clean Buildings <br />Performance Standard. <br />Building Owner/Authorized Representative: <br />Printed Name: <br />Signature: <br />