My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-01-13-minutes-solid-waste-and-maintenance
>
Meetings
>
2026
>
03. March
>
2026-03-03 10:00 AM - Commissioners' Agenda
>
2026-01-13-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2026 1:46:28 PM
Creation date
2/26/2026 1:27:11 PM
Metadata
Fields
Template:
Meeting
Date
3/3/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
142099
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kittitas County Courthouse Energy Audit <br />.►v <br />5.1 LIGHTING ECM SUMMARY <br />Table 5-1: Lighting ECM Annual Savings <br />Energy <br />Cost <br />Implementation <br />Simple Payback <br />Description <br />Savings <br />Savings <br />Cost <br />(years) <br />y <br />Notes <br />(kWh/yr) <br />($/yr) <br />Light fixture replacement - LED <br />27,818 <br />$2,225.43 <br />$32,200.00 <br />14.5 <br />1,2 <br />Install occupancy -sensing lighting <br />9,587 <br />$766.94 <br />$6,800.00 <br />8.9 <br />1 <br />controls in rooms less than 300 sq ft <br />Exterior lighting controls — <br />899 <br />$71.90 <br />$600.00 <br />8.3 <br />1,3 <br />astronomic timer <br />Notes <br />1. Cost savings based on estimated electricity cost of $0.08 per kWh. <br />2. Implementation cost based on fixture replacement or retrofit by maintenance staff. <br />3. Implementation cost based on one-to-one replacement of existing time clock with no <br />changes to electrical circuits. <br />5.2 ENVELOPE ECMS <br />Table 5-2 Envelope ECM Annual Savings <br />Energy <br />Energy <br />Cost <br />Implementation <br />Simple <br />Description <br />Savings <br />Savings <br />Savings <br />Cost <br />Payback <br />Notes <br />(kWh/yr) <br />(CCF/yr) <br />($/yr) <br />(years) <br />Window <br />5,452 <br />2,180 <br />$3,112 <br />$251,340 <br />81 <br />1,2 <br />Replacements <br />Window <br />4,362 <br />1,090 <br />$1,682 <br />$3,700 <br />2.2 <br />1,3 <br />Glazing - Film <br />Notes <br />1. Cost savings based on estimated electricity cost of $0.08 per kWh. <br />2. Metal -framed windows need to be replaced with double -pane, full -height windows. <br />3. Cost savings based on application of film to existing windows to be installed by <br />maintenance staff. <br />Project Number 22-084 24 <br />October 28, 2025 <br />
The URL can be used to link to this page
Your browser does not support the video tag.