My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-01-13-minutes-solid-waste-and-maintenance
>
Meetings
>
2026
>
03. March
>
2026-03-03 10:00 AM - Commissioners' Agenda
>
2026-01-13-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2026 1:46:28 PM
Creation date
2/26/2026 1:27:11 PM
Metadata
Fields
Template:
Meeting
Date
3/3/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
142099
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kittitas County Courthouse Energy Audit <br />=11("SA"'I <br />3.4.2 Domestic Hot Water <br />Domestic hot water is supplied by two natural gas -fired Rheem Water Heaters with 100-gallon <br />storage capacity (see Figure 3-22). The hot water system is in fair condition. <br />Figure 3-22 Rheem Water Heaters <br />4.0 HISTORICAL ENERGY CONSUMPTION ANALYSIS <br />The city of Ellensburg provides electricity and natural gas to the Kittitas County Courthouse. <br />Water and sewer services are provided by Kittitas County Public Works. The facility has <br />building -level electrical and natural gas metering. <br />4.1 UTILITY RATES <br />Table 4-1 shows the estimated utility use and cost. <br />Project Number 22-084 19 <br />October 28, 2025 <br />
The URL can be used to link to this page
Your browser does not support the video tag.