My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-01-13-minutes-solid-waste-and-maintenance
>
Meetings
>
2026
>
03. March
>
2026-03-03 10:00 AM - Commissioners' Agenda
>
2026-01-13-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2026 1:46:28 PM
Creation date
2/26/2026 1:27:11 PM
Metadata
Fields
Template:
Meeting
Date
3/3/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
142099
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TITAN <br />14 <br />�15ltie;s RC. Yakima ':':A 1969Q1 <br />5 D.941.83C,6 111 ANL- L677RD <br />TO: Riley Eres <br />Contractor Belsaas & Smith <br />FROM: Adam Rieker <br />Subcontractor Titan Electrical <br />CHANGE TITLE I MRW Exterior Lighting <br />COST IS TO: <br />Project: Lower Valley Transfer Station <br />2603 Green Ave <br />Ellensburg, WA 98926 <br />Subcontract # <br />Date: <br />10/1 /2025 <br />Change # <br />12 <br />Amount: <br />$1,795.00 <br />Initiated By: <br />Titan Electrical <br />Reason: <br />Design Change <br />Type: <br />Additive - Lump Sum <br />Provide and install (1) 10" x 1/4" x 2" grounding busbar kit, (1) 5/8" ground rod with copper conductor and <br />clamp, and (4) 5' long grounding grounding clamps to MRW building. The cost includes all fittings, <br />conductors, and hardware necessary for installation. <br />Cost Breakdown This Change: <br />Labor <br />$765.00 <br />Material <br />$729.94 <br />O&P <br />$299.16 <br />Total <br />$1,795.00 <br />Authorized By: Titan Electrical <br />SUBCONTRACTOR <br />Signature: <br />Print Name: <br />Adam Rieker <br />Title: <br />Project Manager <br />Date: <br />09/30/2025 <br />Contract Revision Summary: <br />Original Contact <br />Prior Approved Changes <br />Contract After Changes <br />This Change <br />Total Contract to Date <br />Accepted By: <br />Signature: <br />Print Name: <br />Title: <br />Date: <br />$1,639,430.00 <br />$113,962.80 <br />$1,753,392.80 <br />$1,795.00 <br />$1,755,187.80 <br />CONTRACTOR <br />Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.