My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-01-13-minutes-solid-waste-and-maintenance
>
Meetings
>
2026
>
03. March
>
2026-03-03 10:00 AM - Commissioners' Agenda
>
2026-01-13-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2026 1:46:28 PM
Creation date
2/26/2026 1:27:11 PM
Metadata
Fields
Template:
Meeting
Date
3/3/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
142099
Type
Minutes
该页面上没有批注。
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kittitas County Courthouse Energy Audit AKANA <br />3.3 ELECTRICAL SYSTEMS <br />3.3.1 Electrical Service and Equipment <br />The courthouse electrical service meter and transformer are at the southwest corner of the <br />building. The electrical service is 208Y/120V three-phase 600A. The electrical service equipment <br />is mostly original to the 1954 construction. <br />The mechanical penthouse and associated rooftop mechanical equipment serving the courthouse <br />is powered by the detention center electrical service. The courthouse electrical service is 208V, <br />which is unsuitable for powering the 480V HVAC loads. The courthouse electrical supply is <br />undersized for the current electrical demand, which has increased dramatically since the original <br />construction, leading to the connection of multiple courthouse AHUs to the detention center's <br />electrical utility supply. As a result, the electrical usage for the courthouse is lower than <br />expected, because it does not include most of the mechanical HVAC load. <br />Considering the age and condition of the electrical service equipment, it is strongly <br />recommended that a thermographic survey be performed on the electrical connections and <br />conductors to identify possible overheating. Degradation of electrical connections wastes energy <br />as heat, reduces the efficiency of the electrical system, and can lead to equipment failure and <br />electrical hazards and potential fire. Excessive heat losses may indicate that electrical equipment <br />is past its service life and requires replacement. <br />3.3.2 Backup Power Generation <br />The courthouse building electrical system does not include backup power generation. Some of <br />the rooftop HVAC equipment is powered from the detention center electrical service (see Section <br />3.3.1), which is connected to a standby generator. <br />3.3.3 Lighting and Controls <br />Interior light fixtures consist primarily of fixtures that utilize 2-foot and 4-foot fluorescent bulbs <br />(see Figure 3-9). Most of the light fixtures in common areas are original to the building <br />construction. Some of the fixtures in the shop/maintenance area have been switched to LED (see <br />Figure 3-10). Single Edison -base bulbs have been replaced with LED types. LED strip lights have <br />been installed in a basement office area (see Figure 3-11). The courtrooms have articulated CFL <br />recessed -ceiling cans (see Figure 3-12). <br />Lights in common areas are manually switched. About half of the small offices (mostly those that <br />are single -occupant) have in -wall single -device -type occupancy -sensing lighting controls. There <br />are no daylight responsive controls, dimmable light fixtures, or networked/integrated lighting <br />Project Number 22-084 11 <br />October 28, 2025 <br />
The URL can be used to link to this page
Your browser does not support the video tag.