My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-01-13-minutes-solid-waste-and-maintenance
>
Meetings
>
2026
>
03. March
>
2026-03-03 10:00 AM - Commissioners' Agenda
>
2026-01-13-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2026 1:46:28 PM
Creation date
2/26/2026 1:27:11 PM
Metadata
Fields
Template:
Meeting
Date
3/3/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
142099
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IGttitas County Courthouse Energy Audit <br />TABLE OF CONTENTS <br />ABBREVIATIONSAND ACRONYMS....................................................................................................1 <br />DEFINITIONS.............................................................................................................................................. <br />3 <br />1.0 <br />EXECUTIVE SUMMARY.............................................................................................................. <br />6 <br />2.0 <br />BUILDING INTRODUCTION...................................................................................................... <br />6 <br />3.0 <br />EXISTING SYSTEM DESCRIPTIONS AND CONDITIONS.................................................... <br />7 <br />3.1 BUILDING ENVELOPE................................................................................................... <br />7 <br />3.2 MECHANICAL SYSTEMS............................................................................................... <br />8 <br />3.2.1 Heating, Ventilation, and Air Conditioning Systems ....................................... 8 <br />3.2.2 Refrigeration.........................................................................................................10 <br />3.3 ELECTRICAL SYSTEMS................................................................................................11 <br />3.3.1 Electrical Service and Equipment......................................................................11 <br />3.3.2 Backup Power Generation..................................................................................11 <br />3.3.3 Lighting and Controls.........................................................................................11 <br />3.3.4 On -site Renewable Energy.................................................................................17 <br />3.4 PLUMBING SYSTEMS....................................................................................................17 <br />3.4.1 Domestic Water Supply......................................................................................17 <br />3.4.2 Domestic Hot Water............................................................................................19 <br />4.0 <br />HISTORICAL ENERGY CONSUMPTION ANALYSIS..........................................................19 <br />4.1 UTILITY RATES..............................................................................................................19 <br />4.2 ELECTRICAL END -USE DISTRIBUTION.................................................................. <br />21 <br />4.3 NATURAL GAS END -USE DISTRIBUTION.............................................................. <br />22 <br />4.4 WATER END -USE DISTRIBUTION............................................................................. <br />23 <br />5.0 <br />SUMMARY OF ENERGY CONSERVATION MEASURES .................................................... <br />23 <br />5.1 LIGHTING ECM SUMMARY....................................................................................... <br />24 <br />5.2 ENVELOPE ECMS.......................................................................................................... <br />24 <br />5.3 MECHANICAL ECMS................................................................................................... <br />25 <br />5.4 PLUMBING ECMS.......................................................................................................... <br />25 <br />6.0 <br />REFERENCES............................................................................................................................... <br />27 <br />Project Number 22-084 i <br />October 28, 2025 <br />
The URL can be used to link to this page
Your browser does not support the video tag.