Laserfiche WebLink
- Energy performance monitoring protocols. <br />+ Staff Training: Facilities staff will receive targeted training on: <br />- Operation and maintenance of new lighting controls, thermostats, and window <br />film. <br />- Adjustments to HVAC settings following retro commissioning. <br />+ Ongoing Commissioning: The Energy Manager will incorporate each EEM into the ongoing <br />commissioning plan, including periodic performance reviews and re -tinning as needed. <br />ENERGY MANAGER <br />The building owner has designated an energy manager (EM) to develop and maintain an energy <br />management plan for the building. <br />Energy Manager's name: Cody Cupp <br />Energy Managers association with the building: Assistant Director of Facilities Maintenance <br />ENERGY ACCOUNTING <br />The Courthouse building is meeting current EUI targets. However, as noted above, the electrical <br />system of the courthouse cannot carry all the Courthouse equipment, so the electricity to the Air <br />Handling Units for the Courthouse is shown on the Detention Center's meter and electric bills. <br />Without submetering systems or replacing electrical systems in the courthouse, a fully accurate <br />energy accounting between the two buildings cannot be determined. <br />The building's net energy is monitored and recorded in accordance with sections 5.1.2.2, 5.1.2.3 & <br />5.1.2.4. This table will gain additional rows as this document develops over time. <br />TABLE 4 - ENERGY ACCOUNTING <br />