Laserfiche WebLink
BELSAAS <br />u <br />;h SMITH_ <br />} <br />BELSASC0330H <br />October 1, 2025 <br />Re: MRW Grounding <br />P.O. BOX 926 / 103 EAST 4T" AVE, SUITE 209 <br />ELLENSBURG, WA 98926 <br />509-925-9747 FAX: 509-962-3031 <br />brandon@belsmith.com <br />Per the description below, we present the following change order proposal #47 (COP#47). <br />Per the Memo dated 8/21 regarding the grounding at the bulk storage fuel tanks. This proposal <br />includes the labor and materials needed to install a common grounding electrode for the bulk <br />fuel storage tanks. Please see the memo and subcontractor back up below for additional <br />details. <br />Total Cost added to contract: $2,064.24 + WSST <br />Time extension required: 1 days <br />Sincerely, <br />Riley Eres, <br />Belsaas & Smith Construction <br />