My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-01-13-minutes-solid-waste-and-maintenance
>
Meetings
>
2026
>
03. March
>
2026-03-03 10:00 AM - Commissioners' Agenda
>
2026-01-13-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2026 1:46:28 PM
Creation date
2/26/2026 1:27:11 PM
Metadata
Fields
Template:
Meeting
Date
3/3/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
142099
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 TITAN <br />509.941.8306 111 A`JLL677RU <br />TO: Riley Eres <br />Client Belsaas & Smith Construction <br />FROM: Adam Rieker <br />Contractor Titan Electrical LLC <br />CHANGE TITLE I Site Lighting Dimmers/Shields <br />COST IS TO: <br />Project: Lower Valley Transfer Station <br />2603 Green Ave <br />Ellensburg, WA 98926 <br />Subcontract# <br />Date: 12/29/2025 <br />Change # 23 <br />Amount: $25,653.96 <br />Initiated By: Titan Electrical <br />Reason: Design Change <br />Type: Additive - Lump Sum <br />Furnish and install FAO dimming modules for (65) fixtures. This quantity covers (19) Type FL and (43) <br />Type SH lighting fixtures for site lighting as well as the (3) Type FL fixtures in the Transfer Building tunnel. <br />The cost also includes visors for (22) Type FL fixtures and skirt and side shields for (43) Type SH fixtures. <br />Also included is the cost of (1) week of boom lift rental. (1) Hour of labor was included for each fixture <br />for unpackaging/prep, lift relocation, and installation. <br />Credit Breakdown This Change: <br />Labor <br />$7,475.00 <br />Material <br />$13,073.30 <br />Rental <br />$830.00 <br />O&P <br />$4,275.66 <br />Total <br />$25,653.96 <br />Authorized By: Titan Electrical LLC Accepted By: <br />Signature: <br />Print Name: <br />CONTRACTOR <br />Adam Rieker <br />Title: Project Manager <br />Date: 12/29/2025 <br />Signature: <br />Print Name: <br />Title: <br />Date: <br />CONTRACTOR <br />Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.