Laserfiche WebLink
7 TITAN <br />509.941.8306 111 A`JLL677RU <br />TO: Riley Eres <br />Client Belsaas & Smith Construction <br />FROM: Adam Rieker <br />Contractor Titan Electrical LLC <br />CHANGE TITLE I Site Lighting Dimmers/Shields <br />COST IS TO: <br />Project: Lower Valley Transfer Station <br />2603 Green Ave <br />Ellensburg, WA 98926 <br />Subcontract# <br />Date: 12/29/2025 <br />Change # 23 <br />Amount: $25,653.96 <br />Initiated By: Titan Electrical <br />Reason: Design Change <br />Type: Additive - Lump Sum <br />Furnish and install FAO dimming modules for (65) fixtures. This quantity covers (19) Type FL and (43) <br />Type SH lighting fixtures for site lighting as well as the (3) Type FL fixtures in the Transfer Building tunnel. <br />The cost also includes visors for (22) Type FL fixtures and skirt and side shields for (43) Type SH fixtures. <br />Also included is the cost of (1) week of boom lift rental. (1) Hour of labor was included for each fixture <br />for unpackaging/prep, lift relocation, and installation. <br />Credit Breakdown This Change: <br />Labor <br />$7,475.00 <br />Material <br />$13,073.30 <br />Rental <br />$830.00 <br />O&P <br />$4,275.66 <br />Total <br />$25,653.96 <br />Authorized By: Titan Electrical LLC Accepted By: <br />Signature: <br />Print Name: <br />CONTRACTOR <br />Adam Rieker <br />Title: Project Manager <br />Date: 12/29/2025 <br />Signature: <br />Print Name: <br />Title: <br />Date: <br />CONTRACTOR <br />Page 1 of 1 <br />