Laserfiche WebLink
Cost Breakdown <br />Project Name: Ellensburg Rodeo Arena lmprovments RFI 004 <br />Project No. <br />Contractor: McGannElectric <br />coP4 <br />1?J512025Date: <br />Contractor Ref. No. <br />Description Quantity <br />Unit <br />Tvpe <br />Labor Material Equipment Total <br />CostUnit $Cost Unit $Cost Unit $Cost <br />s $$$ <br />$$$$ <br />Electrician Labor 32 HR $106.95 s 3.422.40 $$$ 3,422.40 <br />Foreman Labor 32 HR $117.14 $ 3,748.48 $$s 3.748.48 <br />$$$$ <br />Panel. main and branch breakers 1 LT $$3,970.00 $ 3.970.00 $$ 3.970.00 <br />$$$$ <br />$$$$ <br />2.5" pvc bell end 1 EA $$11.26 $11.26 $11.26 <br />2.5" pvc 160 FT $$2.03 $ 324.80 $$ 324.80 <br />2.5" couplinqs 10 EA $$2.63 $26.30 $$26.30 <br />2.5" riqid 90 4 EA $$91.67 $ 366.68 $$ 366.68 <br />2.5" pvc FA I EA $$3.93 $31.44 $$31.44 <br />2.5" riqid 40 FT $$22.22 $ 888.80 $$ 888.80 <br />2.5" riqid threadless connector 1 EA $$175.25 $ 175.2s $$ 175.25 <br />deep shut 10 Ft $$2.62 $26.20 $$26.20 <br />2.5" riqid strut straps 4 EA $$3.21 $12.84 $$12.84 <br />qroundinq and bondinq 1 LT $$55.00 $55.00 $$55.00 <br />olue. hardware.taoe, ohenolics 1 LT $$75.00 $75.00 $$75.00 <br />2.5" lock rinqs and bushings I LT $$10.00 $10.00 $$10.00 <br />#250A1 920 FT $$1.90 $ 1,748.00 $$ 1.748.00 <br />tJ4 thhn 230 FT $$1.54 $ 354.20 s $ 354.20 <br />$$$$ <br />Lift fees 4x4 scissor larqe working 'l LT $$1,090.00 $ 1,090.00 $$ 1,090.00 <br />Permit fees (added feeder)1 LT $$105.90 $ 105.90 $$ 105.90 <br />Labor Subtotal $ 7,170.88 <br />$s $$ <br />$$$$ <br />$$$$ <br />Subtotal Cost of Work 2t1t2017 $ 7,170.8E $ 9,271.67 $$ 16,442.55