My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
I - Fully Executed
>
Meetings
>
2025
>
12. December
>
2025-12-16 10:00 AM - Commissioners' Agenda
>
I - Fully Executed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2026 11:11:50 AM
Creation date
2/10/2026 11:11:39 AM
Metadata
Fields
Template:
Meeting
Date
12/16/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve Change Order No. 1 with Cascade Central Construction for the Grandstands Project
Order
9
Placement
Consent Agenda
Row ID
139120
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cost Breakdown <br />Project Name: Ellensburg Rodeo Arena lmprovments RFI 003 <br />Project No. <br />Contractor: McGannElectric <br />coP-3 <br />Date: <br />Contractor Ref. No. <br />11t20t2025 <br />Description Quantity <br />Unit <br />Tvpe <br />Labor Material Equipment Total <br />CostUnit $Cost Unit $Cost Unit $Cost <br />$$$$ <br />$$$$ <br />Electrician Labor 22 HR $106.95 $ 2,352.90 $$$ 2,352.90 <br />Foreman Labor 16 HR $117.14 s 1.874.24 $$$ 1,874.24 <br />$$$$ <br />$$$$ <br />50A 2pole QBHW breaker 1 EA $$166.04 $ 166.04 $$ 166.04 <br />1" emt 20 FT $$1.94 $38.80 $$38.80 <br />1" emt connectors 4 EA $$5.89 $ 23.56 $$ 23.56 <br />1" riqid coupling 4 EA $$5.76 $23.04 $$23.04 <br />'1" riqid 90 8 EA $$19.29 $ 154.32 $$ 154.32 <br />'t" riqid 40 FT $$6.1 5 $ 246.00 $$ 246.00 <br />1" riqid threadless connector 2 EA $$14.64 $ 29.28 $$ 29.28 <br />1'PVC 280 FT $$0.62 $ 173.60 $$ 173.60 <br />1" PVC couplinqs 12 EA $$0.61 $7.32 $$7.32 <br />1'PVC FA 16 EA $$0.91 $14.56 $$14.56 <br />1'' LB 2 EA $$1 8.1 0 $36.20 $$36.20 <br />deep strut 10 FT $$3.41 $34.1 0 $$34.1 0 <br />1" strut straps 8 EA $$1.68 $'13.44 $$13.44 <br />#6 thhn 540 FT $$1.11 $ 599.40 $$ 599.40 <br />#8 thhn 180 FT $$0.72 $ 129.60 $$ 129.60 <br />#12 thhn 1 500 FT $$0.25 $ 375.00 $$ 375.00 <br />hardware, terminations, glue, tape 1 LT $$30.00 $30.00 $$30.00 <br />$s $$ <br />$$$$ <br />$$$$ <br />Labor Subtotal $ 4.227.',14 <br />$$$$ <br />$$$$ <br />$$$$ <br />Subtotal Cost of Work 21112017 $ 4,227.14 $ 2,094.26 $$ 6,321.40
The URL can be used to link to this page
Your browser does not support the video tag.