Laserfiche WebLink
Cost Breakdown <br />Project Name: Ellensburg Rodeo Arena lmprovments <br />Project No. <br />Contractor: McGannElectric <br />coP-2 <br />Date: <br />Contractor Ref. No. <br />11t19t2025 <br />Description Quantitv <br />Unit <br />Tvpe <br />Labor Material Equipment Total <br />CostUnit $Cost Unit $Cost Unit $Cost <br />$$$$ <br />$$$$ <br />Electrician Labor 5 HR $106.95 $ 534.75 $$$ 534.75 <br />Foreman Labor HR $117.14 $$$$ <br />$$$$ <br />$$$$ <br />$$$$ <br />12x12x6 Nema3R Jbox 1 EA $$144.74 $ 144,74 $$ 144.74 <br />Sinole qanq WP cover 2 EA $$17.94 $35.88 $$35.88 <br />Shallow strut 10 FT $$2.43 $ 24.30 $$24.30 <br />2" pvc fttinqs 1 LT $$4.62 s 4.62 $$4.62 <br />1.25" pvc fittings 1 LT $$2.41 $2.41 $$2.41 <br />1" pvc fittinqs I LT $$10.06 $10.06 $$10_06 <br />qround luq 1 EA $$3.03 $3.03 $$3.03 <br />hardware I LT $$15.50 s 15.50 $$15.50 <br />terminations - WP 1 LT $$70.93 $ 70.93 $$70.93 <br />$$$ <br />$$$$ <br />$$$$ <br />$$$$ <br />$$$ <br />$$$$ <br />s $$ <br />$$$$ <br />$$$$ <br />$$$$ <br />Labor Subtotal 534.75 <br />$$$$ <br />$$$ <br />$$$$ <br />Subtotal Cost of Work 2t112017 $ 534.75 $ 3'11.47 $$ 846.22 <br />lssued 1 l/20/2025