My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.09.26 PW SS Briefings
>
Meetings
>
2026
>
02. February
>
2026-02-09 1:30 PM - Public Works Study Session
>
2.09.26 PW SS Briefings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2026 5:47:36 PM
Creation date
2/4/2026 4:48:26 PM
Metadata
Fields
Template:
Meeting
Date
2/9/2026
Meeting title
Public Works Study Session
Location
BoCC Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROMINENT USES REGIONAL FAMILY WAGE JOB CREATES RISKS FINANCIAL LOCATION <br /> CONTRIBUTION CREATION SKILLED LABOR SUSTAINABILITY <br /> EXISTING USE NONE NONE NONE NIA NIA NIA <br /> POOR: COMPETES WITH <br /> HOSPITALITYAND POOR: EXTRACTIVE LOCAL BUSINESSES: NO DISTINCTIVE <br /> DESTINATION TOURISM EXTRACTIVE AND/ AND/OR RETENTIVE NO COLLATERAL POOR ADVANTAGE <br /> OR RETENTIVE DAMAGE <br /> MODERATE: MODERATE: COMPETES WITH <br /> COMMERCIAL RETENTIVE AND/ RETENTIVE AND/OR INDUSTRY LOCAL BUSINESSES: MODERATE NO DISTINCTIVE <br /> BUSINESS PARK OR ADDITIVE ADDITIVE DEPENDENT COLLATERAL ADVANTAGE <br /> DAMAGE <br /> TECHNOLOGY ACCELERATIVE DIRECT:YES REQUIRES NEAR UNIVERSITY <br /> COMMERCIALIZATION AND INDIRECT: MAYBE YES-ONGOING EFFECTIVE ONGOING HIGH AND NEAR ECONOMIC <br /> CENTER MULTIPLICATIVE INDUCED: NO IMPLEMENTATION DEVELOPMENT EFFORTS <br /> Exhibit 2: Old Heat Comparison Chart <br /> 32 1 Old Heat CERB Feasibility Study <br />
The URL can be used to link to this page
Your browser does not support the video tag.