Laserfiche WebLink
There are architectural pieces of Old Heat that have been salvaged or retained in <br /> the building during phases I and II of the construction projects. These pieces can <br /> be used in the adaptive reuse of the building to bring the history and character of <br /> the building to life when renovated with four overarching objectives that guide the <br /> project's design, partnerships, and outcomes: <br /> Division Item 2018 Bid 2025 Escalated Cost (45%) 2025 Cost wf Prevailing Wage (45%) <br /> GCs Soft Costs (OH&P, Insurance, Bonding, B&O tax) $ 1,134,596.00 $ 1,645,164.20 $ 1,891,938.83 <br /> Existing Conditions (demo and abatement) $ 237,190.00 $ 343,925.50 $ 395,514.33 <br /> Earthwork $ 156,895.00 $ 227,497.75 $ 2610622.41 <br /> Exterior Improvements $ 126,332.00 $ 183,181.40 $ 210,658.61 <br /> Concrete $ 261,604.00 $ 379,325.80 $ 4360224.67 <br /> Masonry $ 242,348.00 $ 351,404.60 $ 404,115.29 <br /> Metals $ 645,514.00 $ 935,995.30 $ 100760394.60 <br /> Wood and Plastic $ 74,603.00 $ 108,174.35 $ 124,400.50 <br /> Thermal and Moisture Protection $ 230,053.00 $ 333,576.85 $ 383,613.38 <br /> Doors and Windows $ 392,907.00 $ 569,715.15 $ 655,172.42 <br /> Finishes $ 658,582.00 $ 954,943.90 $ 10098,185.49 <br /> Specialties $ 56,385.00 $ 81,758.25 $ 94,021.99 <br /> Conveyance $ 199,500.00 $ 289,275.00 $ 3320666.25 <br /> Fire Protection $ 82,050.00 $ 118,972.50 $ 136,818.38 <br /> Plumbing and Mechanical $ 687,727.00 $ 9970204.15 $ 101460784.77 <br /> Electrical $ 694,297.00 $ 1,006,730.65 $ 1,157,740.25 <br /> Design Contingency $ 179,666.00 $ 260,515.70 $ 299,593.06 <br /> TOTALS $ 5,8800583.00 $ 8526,845.35 $ 90805,872.15 <br /> Table 2:Build Detail <br /> Old Heat CERB Feasibility Study 125 <br />