My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order 03
>
Meetings
>
2026
>
02. February
>
2026-02-03 10:00 AM - Commissioners' Agenda
>
Change Order 03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2026 1:19:01 PM
Creation date
1/29/2026 1:18:54 PM
Metadata
Fields
Template:
Meeting
Date
2/3/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve Change Order No. 3 with Cascade Central
Order
4
Placement
Consent Agenda
Row ID
140878
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br />P.O. Box 119 Wenatchee, WA 98807 <br />Phone: (509)662-7119 Fax: (509)662-4465 <br />Bid Items Quantity Unit Unit Price Amount <br />1 RFP 04 - Utility Changes <br />-Production Adjustment for 8" C900 to 8" DI Pipe (Bid @ $61.35/LF, Now @ $88.08)225 LF 26.73$ $6,014.25 <br />-Production Adjustment for 4" C900 to 4" DI Pipe (Bid @ $59.31/LF, Now @ $86.04)214 LF 26.73$ $5,720.22 <br />-Material Cost Difference: C900 Water to Ductile Iron 1 LS 19,000.00$ $19,000.00 <br />-Furnish & Install Catch Basins 3 EA 2,600.00$ $7,800.00 <br />$38,534.47 <br />$38,534.47 <br />Qualifications: Please Read Carefully <br />1. Washington State Sales Tax has been not been included in proposal. <br />2. Prevailing Wage has been accounted for in proposal. <br />3. <br />4. <br />5. Excludes Water System Support. <br />6. Exludes Construction Survey. <br />7. Engineering & Professional Surveying Services are Excluded. <br />8. <br />9. <br />10. <br />11. <br />12. <br />13. Any scope of work not specifically included as a line item in this proposal is excluded. <br />14. <br />15. <br />16. <br /> <br />Sincerely, <br />SELLAND CONSTRUCTION, INC. <br />Ron Zerr III <br />(509) 961-7825 <br />Bid Date: January 22, 2026 <br />Ellensburg Rodeo Arena Improvements - RFP 04 COP <br />Erosion Control Inspections, Reporting, Monitoring & Maintenance are Excluded. Stormwater Permit by others. <br />Rock excavation (i.e. Solid Rock, Caliche, Hard Pan, Cemented Soils and/or Boulders larger than 1 Cubic Yard) have not been included. Price Negotiation will be <br />required if these materials are encountered. <br />Subtotal <br />Over Excavation of Unsuitable Material has not been accounted for, price negotiation will be required if these materials are encountered. <br />Actual quantities installed shall be tracked/measured and the basis of payment at the unit prices included in this proposal unless otherwise agreed. <br />Due to global supply chain disruptions and market volatility we reserve the exclusive right to adjust our proposal for material escalation. <br />Proposal is valid for 30 days. This proposal shall be made part of any subcontract. <br />Total <br />If you have any questions or need additional information with regard to our proposal please give us a call. <br />Dust control has been provided while we are actively working the site. No permanent or sustained dust control or mitigation has been included. <br />Fees for Utilities, County, City, Etc. are not included. Cultural Resource Services are not covered in our scope. <br />Hazardous Materials Abatement, Removal, Handling, Disposal, etc. are not expected onsite and are therefore Excluded. <br />Watering & Dust Control are Included for Selland's scope of work and duration only. No OT Dust Control or beyond our work. <br />SELLAND <br />INC. <br />CONSTRUCTION <br />General Contractors <br />Page 1 of 1
The URL can be used to link to this page
Your browser does not support the video tag.