My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Fully executed Document (2)
>
Meetings
>
2025
>
11. November
>
2025-11-18 10:00 AM - Commissioners' Agenda
>
Fully executed Document (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2026 10:50:49 AM
Creation date
1/13/2026 10:50:45 AM
Metadata
Fields
Template:
Meeting
Date
11/18/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Resolution to Acknowledge a Letter and Accept Updated Timeline Bowling Alley Opening Date to July 1, 2026
Order
5
Placement
Consent Agenda
Row ID
137941
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B o'u.rii r' c1 P pti u cts <br />525 West Laketon Avenue <br />Muskegon, Ml 49441 <br />www. BrunswickBowting' com <br />October 13,2A25 <br />Ryan Wales <br />Strike CentraI <br />830 North Poplar Street <br />Eltensburg, WA98926 <br />Subject: Brunswick Modernization Contract Status Update <br />Mr. Wales, <br />Thank you for reaching out to Brunswick for a status update on your proposed project at <br />Strike Centrat in Ettensburg, WA. <br />We received your signed contract on May g,2025 on behatf of C.R. Wates lnvestments, LLC <br />with Brunswick BowLing Products, LLC (referred herein as "Brunswick") for a major <br />renovation project at an existing dormant 16-tane bowl.ing center located at 830 North <br />Poptar Street, Ettensburg, WA 98926. The prior bowl'ing center name was 'Rodeo Bowt"' <br />The ptanned bowl.ing center name upon reopening is "strike Centrat" and wil'tfeaturel2 <br />tanes. The originat desired detivery date was August 1 , 2025 according to the contract' <br />The Brunswick contract inctuded Brunswick equipment, instatlation, and training for the <br />foLtowing items at a summary tevet: <br />r New Brunswick Boost STStringPin Pinsetters: sanctioned bythe United States <br />Bowting Congress (referred herein as "USBC") for teague and tournament playthat <br />are significantty tower power consuming than current pinsetters, require tess <br />maintenance than historicat pinsetters, and increase employee safety due to easy <br />troubteshooting and minimaI moving parts <br />r New Brunswick Prolane synthetic lanes: Brunswick's premium tane with <br />patented advanced tane markings for competitive bowters, thickest lane on the <br />market for tong term resitiency, gLow under UV ti$hts for entertainment bowting, and <br />features a tifetime warranty against detamination <br />r New pin decks and ftat gutters at the bowting pins: ensures USBG compliance <br />and maximum pin action for higher scores and reduced operational maintenance <br />o Brunsvvick Nitro LED RGB pin deck Lighting: high efficiency, long tife LED modutes <br />that can tight up the pins with white Light or any combination of cotors ptus strike, <br />gutter, spare, and other animations when integrated with Brunswick Sync scoring <br />r Brunswick Frameworx Pinsefter Masking Units: new graphic panets and frames <br />that are atmost 10'tatt in front of the pinsetters to reptace the obsotete and dated <br />graphics <br />o Brunswick Genter Stage Bal,t Return Hood and Racks: Replace the aged and <br />obsolete Brunswick 2000 batt return racks on the tane approach area that have a <br />Page I of3
The URL can be used to link to this page
Your browser does not support the video tag.