My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Feasability Study - C
>
Meetings
>
2025
>
11. November
>
2025-11-04 10:00 AM - Commissioners' Agenda
>
Feasability Study - C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2026 10:03:56 AM
Creation date
1/13/2026 10:03:05 AM
Metadata
Fields
Template:
Meeting
Date
11/4/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve the Kittitas County Public Health & Safety Building Feasibility Study
Order
3
Placement
Consent Agenda
Row ID
137354
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
mua architects 5A11 FRANC!ET8 PORTLA\ID <br />Assumptions: <br />Sustainability goals will follow County declared priorities; MWA will make recommendations. <br />MWA will provide drawings using Autodesk Revit program and in PDF format for reviews. <br />All drawings and exhibits provided are planning level in nature; they will be to scale digitally <br />for cost estimating purposes and diagrammatic and require further development by a <br />professional team licensed in Washington State prior to use in construction documentation. <br />MWA will provide reports using MS Word and in PDF format for reviews. <br />Document review comment periods by the County are ten (10) calendar days or less. <br />All comments by the County stakeholders will be vetted by the County Project Manager. <br />All comments that cannot be incorporated into the project documents will be adjudicated by <br />the designated County Project Manager. <br />The County will provide access to facilities for site investigations as needed. <br />The County will provide a Project Manager for this project; copy them on all correspondence <br />with other County personnel. <br />All deliverables to be digital. <br />Furniture, fixtures and equipment procurement excluded; space planning and <br />recommendations for style/types of furniture included. <br />No drawings will be provided by civil, mechanical or electrical subconsultants; their design <br />input will be captured in the notes from the workflow and space needs workshop in the form <br />of a basis of design narrative for cost and space planning purposes. <br />No geotechnical engineering services are included; MWA will incorporate available <br />geotechnical data readily available from the County in massing layouts and costs <br />assumptions. <br />No environmental engineering services are included; the County will share any known site <br />contamination issue for inclusion in costs. <br />No site survey is included; MWA will use existing readily available County-provided GIS data <br />in lieu of survey if one is not available for the site. <br />No traffic data or traffic engineering will be conducted as part of this study. <br />A <br />CC: Leslee Randolph
The URL can be used to link to this page
Your browser does not support the video tag.