My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change order
>
Meetings
>
2025
>
12. December
>
2025-12-16 10:00 AM - Commissioners' Agenda
>
Change order
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2026 8:14:38 AM
Creation date
1/13/2026 8:14:34 AM
Metadata
Fields
Template:
Meeting
Date
12/16/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve and Authorize Chair's Signature on AIA Document G701-2017 Change Order #005
Order
4
Placement
Consent Agenda
Row ID
139120
Type
Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Docusign Envelope lD: 43D1 D6F8-24F6-48DGA9D7-4C4CFDF/9909 <br />P.O. BOX 926 / 103 EAST 4rH AVE, SUITE 209 <br />EIIENSBURG, WA 98926 <br />oz 56t-925-97 47 C: 519-278-8554 <br />scottc@belsmith.com <br />BELSIttGlO:t3oll <br />December 4,2025 <br />Re: Fagade Repair- COP #09 <br />The concrete repair work to the exterior of the building is complete with an additional 3,100 <br />SF/LF of fagade repaired. Belsaas and Smith's unit price was reduced for this additional work to <br />585.50 per SF/LF, resulting in a net increase of 5265,050. <br />Total cost of proposal: Two Hundred Sixty-Five Thousand Fifty Dollars 5265,050.00 + WSST <br />Time extension required:0 days <br />Sincerely, <br />Reviewed <br />John Anderson,12l5l25 <br />Scott Carlson, <br />Belsaas & Smith Construction
The URL can be used to link to this page
Your browser does not support the video tag.