Laserfiche WebLink
Project Name:COP-4 <br />Project No.12/5/2025 <br />Contractor: <br /> Unit Labor Material Equipment Total <br />Description Quantity Type Unit $Cost Unit $Cost Unit $Cost Cost <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />Electrician Labor 32 HR $106.95 3,422.40$ -$ -$ 3,422.40$ <br />Foreman Labor 32 HR $117.14 3,748.48$ -$ -$ 3,748.48$ <br />-$ -$ -$ -$ <br />Panel, main and branch breakers 1 LT -$ $3,970.00 3,970.00$ -$ 3,970.00$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />2.5" pvc bell end 1 EA -$ $11.26 11.26$ -$ 11.26$ <br />2.5" pvc 160 FT -$ $2.03 324.80$ -$ 324.80$ <br />2.5" couplings 10 EA -$ $2.63 26.30$ -$ 26.30$ <br />2.5" rigid 90 4 EA -$ $91.67 366.68$ -$ 366.68$ <br />2.5" pvc FA 8 EA -$ $3.93 31.44$ -$ 31.44$ <br />2.5" rigid 40 FT -$ $22.22 888.80$ -$ 888.80$ <br />2.5" rigid threadless connector 1 EA -$ $175.25 175.25$ -$ 175.25$ <br />deep strut 10 Ft -$ $2.62 26.20$ -$ 26.20$ <br />2.5" rigid strut straps 4 EA -$ $3.21 12.84$ -$ 12.84$ <br />grounding and bonding 1 LT -$ $55.00 55.00$ -$ 55.00$ <br />glue,hardware,tape, phenolics 1 LT -$ $75.00 75.00$ -$ 75.00$ <br />2.5" lock rings and bushings 1 LT -$ $10.00 10.00$ -$ 10.00$ <br />#250AL 920 FT -$ $1.90 1,748.00$ -$ 1,748.00$ <br />#4 thhn 230 FT -$ $1.54 354.20$ -$ 354.20$ <br />-$ -$ -$ -$ <br />Lift fees 4x4 scissor large working 1 LT -$ $1,090.00 1,090.00$ -$ 1,090.00$ <br />Permit fees (added feeder)1 LT -$ $105.90 105.90$ -$ 105.90$ <br />Labor Subtotal 7,170.88$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />7,170.88$ 9,271.67$ -$ 16,442.55$ Subtotal Cost of Work <br />Ellensburg Rodeo Arena Improvments RFI 004 <br /> Cost Breakdown <br />McGann Electric <br />2/1/2017 <br />Contractor Ref. No. <br />Date: <br />https://mcgannelectric-my.sharepoint.com/personal/jackmcgann_mcgannelectric_com/Documents/McGann Electric/2025 Ellensburg Rodeo 9.30/COPs/COP4 Pnl/Ellensburg Rodeo Arena Improvements COP-4Cost Breakdown Issued 12/8/2025