Laserfiche WebLink
Project Name:COP-3 <br />Project No.11/20/2025 <br />Contractor: <br /> Unit Labor Material Equipment Total <br />Description Quantity Type Unit $Cost Unit $Cost Unit $Cost Cost <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />Electrician Labor 22 HR $106.95 2,352.90$ -$ -$ 2,352.90$ <br />Foreman Labor 16 HR $117.14 1,874.24$ -$ -$ 1,874.24$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />50A 2pole QBHW breaker 1 EA -$ $166.04 166.04$ -$ 166.04$ <br />1" emt 20 FT -$ $1.94 38.80$ -$ 38.80$ <br />1" emt connectors 4 EA -$ $5.89 23.56$ -$ 23.56$ <br />1" rigid coupling 4 EA -$ $5.76 23.04$ -$ 23.04$ <br />1" rigid 90 8 EA -$ $19.29 154.32$ -$ 154.32$ <br />1" rigid 40 FT -$ $6.15 246.00$ -$ 246.00$ <br />1" rigid threadless connector 2 EA -$ $14.64 29.28$ -$ 29.28$ <br />1" PVC 280 FT -$ $0.62 173.60$ -$ 173.60$ <br />1" PVC couplings 12 EA -$ $0.61 7.32$ -$ 7.32$ <br />1" PVC FA 16 EA -$ $0.91 14.56$ -$ 14.56$ <br />1" LB 2 EA -$ $18.10 36.20$ -$ 36.20$ <br />deep strut 10 FT -$ $3.41 34.10$ -$ 34.10$ <br />1" strut straps 8 EA -$ $1.68 13.44$ -$ 13.44$ <br />#6 thhn 540 FT -$ $1.11 599.40$ -$ 599.40$ <br />#8 thhn 180 FT -$ $0.72 129.60$ -$ 129.60$ <br />#12 thhn 1500 FT -$ $0.25 375.00$ -$ 375.00$ <br />hardware, terminations, glue, tape 1 LT -$ $30.00 30.00$ -$ 30.00$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />Labor Subtotal 4,227.14$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />4,227.14$ 2,094.26$ -$ 6,321.40$ Subtotal Cost of Work <br />Ellensburg Rodeo Arena Improvments RFI 003 <br /> Cost Breakdown <br />McGann Electric <br />2/1/2017 <br />Contractor Ref. No. <br />Date: <br />https://mcgannelectric-my.sharepoint.com/personal/jackmcgann_mcgannelectric_com/Documents/McGann Electric/2025 Ellensburg Rodeo 9.30/COPs/RFI 3 Grandstand Receptacles/Ellensburg Rodeo Arena Improvements COP-3Cost Breakdown Issued 11/20/2025