My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-09-22-minutes-ec-study-session
>
Meetings
>
2025
>
10. October
>
2025-10-07 10:00 AM - Commissioners' Agenda
>
2025-09-22-minutes-ec-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2025 3:48:11 PM
Creation date
10/2/2025 3:44:53 PM
Metadata
Fields
Template:
Meeting
Date
10/7/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
136417
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- Es.-ra KITTITAS VALLEY EVENT CENTER <br />/- �ScnnryF <br />Home of the Kittitas County Fair and Ellensburg Rodeo <br />KIMTA S VALLlY 4 f 901 E. 7`h Ave, Suite 1, Ellensburg, WA 98926 <br />EventCenter@co.kittitas.wa.us <br />Office (509) 962-7639 <br />Ki Fax (509) 962-7010 <br />STUDY SESSION STAFF REPORT <br />AGENDA DATE: September 22, 2025 <br />AGENDA ITEM: Rodeo Grandstands Project Updates <br />BACKGROUND: A mandatory pre -bid walkthrough was held on Thursday, <br />September 18th in the morning. About 60 people showed up at the <br />meeting representing general contracting firms from Ellensburg, <br />Wenatchee, Tri-Cities, and Seattle. The meeting was led by <br />construction manager Patti Stacey and Todd Keller with ALSC <br />Architects. Members of the Ellensburg Rodeo Board also showed <br />up in support. It was exclaimed several times that the substantial <br />completion date for this project is June 30, 2026 with notice to <br />proceed no later than October 14, 2025. There will be no weather <br />stoppage allowances and contractors were told to bid accordingly. <br />Later that afternoon, Bryan Elliott, Interim Project Manager led our <br />project kickoff meeting that included all involved parties that the <br />project relies on. CDS has been reviewing the plans and will have <br />comments back to Patti and ALSC sometime today (Monday, <br />September 22, 2025). CDS plans to do phased construction <br />permitting to hold up the project. Patti plans to have a seating <br />design by end of October at the latest and will get it to CDS as soon <br />as it's received to start the review of those plans. <br />INTERACTION: Kittitas Valley Event Center <br />Kittitas County Interim Project Manager (Auditor) <br />Kittitas County Project Construction Manager (Facilities Director) <br />Board of County Commissioners <br />ACTION REQUESTED: None <br />ATTACHMENT(S): None <br />LEAD STAFF: Kady Porterfield, Kittitas Valley Event Center Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.