My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution_WSBO_Award Lightcurve
>
Meetings
>
2025
>
09. September
>
2025-09-16 10:00 AM - Commissioners' Agenda
>
Resolution_WSBO_Award Lightcurve
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2025 12:21:05 PM
Creation date
9/11/2025 12:14:02 PM
Metadata
Fields
Template:
Meeting
Date
9/16/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Resolution Authorizing the Selection of Evergreen Washington Connect, LLC dba Lightcurve for Design and Build of Broadband Services Associated with Grant Funding and to Authorize the Chair to Execute a Professional Services Agreement for Said Project
Order
9
Placement
Consent Agenda
Row ID
135628
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
operational control over the County Funded Network facilities. The following terms will <br />apply in any transition of operational control over the County Funded Network from <br />Contractor to the County or a Successor Operator: <br />15.1 If requested by the County, Contractor may elect to sell certain Drop Facilities <br />(network connection to the outside wall of the customer premises from the <br />County Funded Network, and as further described in Exhibit B, Section 8), <br />funded by the Contractor, to the County or a Successor Operator in its sole <br />discretion. The purchase price for any such sale may be determined by a <br />mutually agreed independent third -party valuation expert. However, if any <br />Drop Facilities are not purchased by the County or a Successor Operator, <br />Contractor will have the right to either leave all or any of the Drop Facilities in <br />place or to remove all or any portion of the Drop Facilities. If the County does <br />not purchase any applicable Drop Facilities and Contractor elects to remove the <br />Drop Facilities, the County will permit Contractor access to its property to <br />remove such facilities as reasonably requested by Contractor. <br />15.2 To the extent any County Funded Network facilities are installed on Contractor - <br />owned poles or within Contractor -owned conduit, Contractor will have the <br />right, as of the termination date, to charge the County or the Successor Operator <br />Contractor's then -standard pole attachment or conduit occupancy fees for the <br />applicable pole or conduit. If requested by Contractor, the County or Successor <br />Operator will enter into Contractor's then -standard pole attachment or conduit <br />occupancy agreement for the applicable poles or conduit. However, following <br />termination, Contractor will have the right to charge its standard pole <br />attachment or conduit occupancy fees regardless of whether the County or <br />Successor Operator enters into such an agreement, and unless otherwise <br />provided in an agreement executed by the applicable parties, such fees will be <br />payable by the County within thirty (30) days of the County's receipt of an <br />invoice from Contractor therefor. <br />15.3 To the extent any County Funded Network facilities are installed on third party <br />poles or within third party conduit or to the extent County is required to obtain <br />any other rights from third parties to install and operate the County Funded <br />Network, (collectively, "Third Party Required Rights"), following termination <br />the County or a Successor Operator shall assume or acquire all obligations and <br />occupancy fees applicable to third party pole attachment or conduit occupancy <br />fees for the applicable pole or conduit utilized in the County Funded Network. <br />Except as may be expressly provided in subsections 15.1- 15.3 above, Contractor will have <br />no further obligation or liability with respect to the County Funded Network following <br />termination of this Agreement for any reason. <br />16. Defense and Indemnity Agreement: <br />Professional Services Agreement <br />Page 7 of 35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.