My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-08-12-minutes-solid-waste-and-maintenance
>
Meetings
>
2025
>
09. September
>
2025-09-02 10:00 AM - Commissioners' Agenda
>
2025-08-12-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2025 12:17:58 PM
Creation date
8/28/2025 12:14:14 PM
Metadata
Fields
Template:
Meeting
Date
9/2/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
135022
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B E LSA AS <br />t�L <br />SMITH <br />BELSASC0330H <br />July 10, 2025 <br />Re: Tire Center Changes <br />P.O. BOX 926 / 103 EAST 4T" AVE, SUITE 209 <br />ELLENSBURG, WA 98926 <br />509-925-9747 FAX: 509-952-3031 <br />riley@belsmith.com <br />Per the description below, we present the following change order proposal #37 <br />(COP#37)Revised. <br />COP #37 includes the addition of the tire center as shown on the updated sheet C13 received <br />on 6/16/2025. The scope of work includes all the labor and materials to perform the specified <br />scope below. <br />• Excavation & Site Prep: Excavate footing as specified per the drawings and ensure <br />subgrade compaction. <br />• Form & Pour: Construct formwork and pour the required footings and retaining walls. <br />• Rebar: Supply and crew -install rebar per engineered layout; tie per code. <br />• Ecology Blocks: Delivery and placement of prefab retaining units per drawings. <br />• Backfill & Fine Grade: Backfill Excavated materials, compact, and fine grade to smooth <br />profile to achieve ample drainage. <br />• Chain -Link Fence: Supply materials, install posts and fabric along the specified <br />alignment. <br />All work to be constructed as shown on drawing sheet C13 Dated May 7,2025. <br />Total Cost added to contract: $127,737.00+ WSST <br />Time extension required: 15 days <br />Sincerely, <br />Riley Eres, <br />Belsaas & Smith Construction <br />
The URL can be used to link to this page
Your browser does not support the video tag.