Laserfiche WebLink
BELSpAA <br />O[ <br />SMITH <br />BELSASC0330H <br />June 3, 2025 <br />Re: Catch basin substitution COP #33 <br />P.O. BOX 926 / 103 EAST 4T" AVE, SUITE 209 <br />ELLENSBURG, WA 98926 <br />509-925-9747 FAX: 509-962-3031 <br />brandon@beismith.com <br />Per the description below, we present the following change order proposal #33 (COP#33). <br />COP #33 includes all the labor and materials needed to substitute the per plan trench drains <br />with the proposed type 1 catch basins. The proposed catch basins are a cost effective way of <br />achieving the same outcome while offering a deduction to the contract. <br />Total Cost Deduct: <br />Time extension required: 0 days <br />Sincerely, <br />Brandon Drexler, <br />Belsaas & Smith Construction <br />$-7,120.77 + WSST <br />