My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
O2025-006
>
Meetings
>
2025
>
07. July
>
2025-07-01 2:00 PM - 2:00pm Public Hearing
>
O2025-006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2025 9:43:35 AM
Creation date
8/21/2025 9:42:57 AM
Metadata
Fields
Template:
Meeting
Date
7/1/2025
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Public Hearing to consider Amendments to the Kittitas County Code Title 17A, Critical Areas Ordinance (CAO).
Order
1
Placement
2:00pm Public Hearing
Row ID
132645
Type
Hold Public Hearing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kittitas County, WA <br />$ 174.01.r00 CRITICALAREAS $ 17A.0r.100 <br />responsibility of the applicant, and monitoring reports will be reviewed by County staff to <br />ensure that performance standards are being met. <br />ii. A contingency plan with courses of action and corrective measures to be taken if <br />monitoring or evaluation indicates project performance standards are not being met, <br />including a possible extension of the monitoring period until it can be shown that <br />performance standards are being met. <br />iii. The mitigation plan shall include financial guarantees ensuring fulfillment of the <br />compensation project, monitoring program, and any contingency measures in accordance <br />with KCC $ 174.01.100.3. <br />iv. The mitigation plan shall address any additional mitigation requirements relevant to the <br />specific critical area as specified in the following chapters. <br />Financial guarantees. <br />a. When mitigation is required for a proposed development but is not completed prior to the <br />County's final permit approval, such as final plat approval or final building inspection, the <br />applicant shall post a financial guarantee to ensure work will be completed and meet the stated <br />environmental objectives. Where financial guarantees are required by other state or federal <br />agencies for specific mitigation features, additional financial guarantees for those features are <br />not required under this provision. <br />b. The financial guarantee shall be in the amount of one hundred and twenty-five percent (125%) <br />of the estimated cost of the uncompleted actions and/or the estimated cost of restoring the <br />functions and values ofthe critical area(s) that is at risk. The guarantee amount shall be based <br />on an itemized cost estimate of the mitigation activity including clearing and grading, plant <br />materials, plant installation, inigation, weed management, monitoring, and other costs. <br />c. The financial guarantee may be in the form of a surety bond, performance bond, assignment of <br />savings account, an irrevocable letter ofcredit guaranteed by an acceptable financial institution, <br />or other form acceptable to the Director, with terms and conditions acceptable to the Kittitas <br />County attorney. <br />d. The financial guarantee shall remain in effect until the Director determines, in writing, that the <br />standards bonded for have been met. Financial guarantees for wetland or stream compensatory <br />mitigation shall be held for a minimum of five (5) years after completion of the work to ensure <br />that the required mitigation has been fully implemented and demonstrated to function and may <br />be held for longer periods when necessary. <br />e. Public development proposals shall be relieved from having to comply with the bonding <br />requirements of this Section if public funds have previously been committed for mitigation, <br />maintenance, monitoring, or restoration. <br />f. Any failure to satisfy critical area requirements established by law or condition, including but <br />not limited to the failure to provide a monitoring report within thirty (30) days after it is due or <br />comply with other provisions of an approved mitigation plan, shall constitute a default, and the <br />Director may demand payment of any financial guarantees or require other action authorized by <br />Kittitas County code or any other law. <br />g. Any funds recovered pursuant to this Section shall be used to complete the required mitigation. <br />Such funds shall not be deposited in the County General Fund, but rather provided with a <br />J <br />Downloaded fiom https://ecode360.com/Kl6857 on 2025-05-15
The URL can be used to link to this page
Your browser does not support the video tag.