My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 2025-141
>
Meetings
>
2025
>
08. August
>
2025-08-05 10:00 AM - Commissioners' Agenda
>
Resolution 2025-141
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2025 9:12:40 AM
Creation date
8/21/2025 9:11:08 AM
Metadata
Fields
Template:
Meeting
Date
8/5/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Resolution Adopting the Kittitas County Tourism Infrastructure Project Applications
Order
1
Placement
Board Discussion and Decision
Row ID
133789
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Prior to recommending the private/pubtic partnership approach, the city went through the <br />fottowing steps to design the fietdhouse through concept and design and the progressive <br />design buitd process. This process included: <br />ln late 2023, authorizing an agreement with the Hetix Design Group to verify <br />fietdhouse project scope, budget and schedute, fotlowed by: work to: reconcite <br />scope, budget and schedute based on the functiona[ program and funding; seek <br />jurisdictionat project approvats through permitting; estabtish a reatistic project <br />schedute; research and evatuate/setect Atternative Detivery Method; and prepare <br />300/o design documents for the buitding and site. As a resu(t of the work the Hetix <br />Design group performed, the city determined that an Atternative Detivery Method <br />was the preferred approach to buitding the fietdhouse, specificatty the progressive <br />design-buitd (PDB) approach. Thus, the pretiminary deslgn work was suspended. <br />Retevant engineering and site studies are avaitable for use in future devetopment of <br />this project. <br />With progressive design-build there were requirements the city to fottow. ln earty <br />2024, authorizing an agreement with Thaxton Parkinson PLLC to provide speciatized <br />legat counset to assist with PDB option. <br />On Aprit 1,2024, Council authorized an agreement with the Weneha Group to serve <br />as the City's Owner Advisor on the project, which is a required component when <br />devetoping a project using the progressive design buitd method (RCW 39.10.220). <br />ln October 2024, the City Councit signed an agreement with Absher/Helix for <br />design-buitd Services through the Vatidation phase. <br />At their February 3,2Q25, study session, the City Councit reviewed options for a new <br />fietdhouse facitity devetoped through the vatidation phase of the Progressive Design <br />Buitd process. The resutting facitity construction cost exceeded $60,000,000 for <br />each of three options for ful.t buitdout. Costs for operating scenarios for each of <br />three facitity design options were exptored through a Market and Operation Ptan <br />conducted by Battard lKing & Associates LTD. Subsequentty, the City Counci[ <br />directed staff to look at a potentiaI for pubtic private partnerships (tease options) for <br />a facitity. <br />a <br />a <br />a
The URL can be used to link to this page
Your browser does not support the video tag.