My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2025-143
>
Meetings
>
2025
>
08. August
>
2025-08-05 10:00 AM - Commissioners' Agenda
>
R2025-143
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2025 8:55:28 AM
Creation date
8/21/2025 8:51:07 AM
Metadata
Fields
Template:
Meeting
Date
8/5/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Resolution to Adopt the 2025 Kittitas County Hazard Mitigation Plan as Approved by the Federal Emergency Management Agency
Order
11
Placement
Consent Agenda
Row ID
133785
Type
Resolution
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2025 Hazard Mitigation Plan <br />Kittitas County, Washington <br />Table <br />Table <br />Table <br />Table <br />Table <br />Table <br />Table <br />Table <br />Table <br />Table <br />Table <br />Table <br />Table <br />Table <br />Table <br />Table <br />Table <br />Table <br />Table <br />Table <br />Table <br />Table <br />Table <br />Table <br />Table <br />Table <br />Table <br />Table <br />Table <br />4-50. <br />4-51. <br />4-52. <br />4-53. <br />4-54. <br />4-55. <br />4-56. <br />4-57. <br />4-58. <br />4-59. <br />4-60. <br />4-61. <br />4-62. <br />4-63. <br />4-64. <br />4-65. <br />4-66. <br />4-67. <br />4-68. <br />4-69. <br />4-70. <br />4-71. <br />4-72. <br />4-73. <br />4-74. <br />4-75. <br />4-76. <br />4-77. <br />4-78. <br />Modified Mercalli Scale vs. Richter Scale <br />ShakeAlert Earthquake Early Warning System Alerting Thresholds <br />Earthquake Annualized Frequency (FEMA National Risk lndex)..... <br />Earthquake Past Events <br />Hazus Earthquake Expected Building Damage by Occupancy <br />Hazus Earthquake Expected Building Damage by Building Type......... <br />Hazus Earthquake Expected Damage to Essential Facilities <br />Hazus Earthquake Building Related Economic Loss Estimates (Millions of Dollars) <br />Hazus Earthquake Expected Damage to Transportation Systems <br />Hazus Earthquake Transportation System Economic Losses (Millions of Dollars).. <br />Earthquake Expected Annual Loss (FEMA National Risk lndex) <br />...... 110 <br />......113 <br />......114 <br />......115 <br />.,....118 <br />118 <br />119 <br />119 <br />120 <br />120 <br />121 <br />Earthquake Risk lndex (FEMA National Risk <br />Earthquake Total Risk Score <br />Flood Types147F <br />Kittitas County Peak Discharges........ <br />NWS Flood Advisories <br />NWS Flash Flood lmpact Based Warnings <br />NWS River Flood Severity Categories <br />Recurrence I ntervals and Probabilities of Occurrences............... <br />Riverine Flooding Annualized Frequency (FEMA National Risk lndex) <br />Kittitas County Repetitive Loss and Severe Repetitive Loss Properties <br />Kittitas County NFIP Policies ..... <br />Flood Events (1997 - 2023)..'... <br />25-Year Climate Projections for Kittitas County <br />Future Climate lndicators for Kittitas County.... <br />Hazus 500-Year Flood Expected Building Damage by Occupancy <br />Riverine Flooding Risk lndex (FEMA National Risk lndex)........ <br />Flood Total Risk Score <br />Types of Slope Movement <br />USGS Landslide Advisories <br />Landslide Annualized Frequency (FEMA National Risk lndex) . <br />Landslide Expected Annual Loss (FEMA National Risk lndex) . <br />Landslide Risk lndex (FEMA National Risk lndex). .. . . <br />Landslide Total Risk Score <br />Stages of a Thunderstorm <br />Types of Thunderstorms... <br />Hail Speed Estimates ....... <br />Types of Tornadoes.......... <br />Types of Strong Winds ..... <br />Converting Traditional Hail Size Descriptions .. <br />H. <br />...........122 <br />...........122 <br />...........123 <br />...........127 <br />...........129 <br />........,..129 <br />...........130 <br />...........130 <br />........... 131 <br />...........132 <br />...........132 <br />........... 133 <br />........... 135 <br />...........136 <br />148 <br />149 <br />150 <br />151 <br />151 <br />152 <br />158 <br />Table 4-79. <br />Table 4-80. <br />Table 4-81. <br />Table 4-82. <br />Hazus 1OO-Year Flood Expected Building Damage by Occupancy ........... .................. 137 <br />Hazus 10O-Year Flood Expected Building Damage by Building Type ........ ................. 137 <br />Hazus 10O-Year Flood Expected Damage to Essential Facilities ...............137 <br />Hazus 1O0-Year Flood Building Related Economic Loss Estimates (Millions of Dollars) <br />.... 138 <br />.... 138 <br />Hazus 10O-Year Flood Expected Building Damage by Building Type.139 <br />Hazus 500-Year Flood Expected Damage to Essential Facilities ............... 139 <br />Hazus 500-Year Flood Building Related Economic Loss Estimates (Millions of Dollars) <br />Riverine Flooding Expected Annual Loss (FEMA National Risk lndex) <br />........140 <br />........140 <br />........141 <br />........141 <br />........142 <br />........145 <br />........146 <br />........148 <br />........148 <br />Table <br />Table <br />Table <br />Table <br />Table <br />Table <br />Table <br />Table <br />Table <br />Table <br />Table <br />Table <br />Table <br />Table <br />Table <br />4-83. <br />4-84. <br />4-85. <br />4-86. <br />4-87. <br />4-88. <br />4-89. <br />4-90. <br />4-91. <br />4-92. <br />4-93. <br />4-94. <br />4-95. <br />4-96. <br />4-97. <br />Table of Contents VI
The URL can be used to link to this page
Your browser does not support the video tag.