My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2025-134
>
Meetings
>
2025
>
07. July
>
2025-07-15 10:00 AM - Commissioners' Agenda
>
R2025-134
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2025 10:37:15 AM
Creation date
8/20/2025 10:36:25 AM
Metadata
Fields
Template:
Meeting
Date
7/15/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Resolution Granting Approval to Roslyn Ridge West Planned Unit Development (PD-24-00001), Short Plat (SP-24-00004) Final Development Plan
Order
12
Placement
Consent Agenda
Row ID
133196
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MDNS - Preliminarv Approval Annlicant Resnonse Staff Review <br />Water <br />l. Stormwater and surface runoff generated by this <br />project must be retained and treated on site. Any <br />discharge onto WSDOT right-otway will require an <br />approved Utility Permit. <br />Agreed - stormwater and surface water <br />generated by this project will be retained on <br />site. No newly generated water by this <br />project will be discharged to WSDOT right- <br />of-away. <br />2. The applicant must provide legal water availability <br />for all new uses on the proposed lots ofthis projecl <br />which can be provided through a letter from a water <br />puryeyor stating that the purveyor has adequate water <br />rights and will provide the necessary water for the new <br />use. <br />Evergreen Valley Group A Water System is <br />providing water for this project and it has <br />adequate water rights as described in the <br />final development plan. <br />3. In accordance with KCC Chapter 13.35.027, the <br />applicant shall provide one of the following documents <br />before final plat approval: a- A letter from a water <br />purveyor stating that the purveyor has adequate water <br />rights and will provide the necessary water for the new <br />use; or b. An adequate water riglrt for the proposed new <br />use; or c. A certificate ofwater budget neuhality from <br />the Department of Ecology or other adequatre interest in <br />water rights from a water bank. <br />Roslyn Ridge West domestic water is <br />provided by Evergreen Valley Water <br />Systems, which is a Group A Water System <br />that has adequate water rights for this <br />project <br />4. All applicants for land divisions shall also submit <br />information on "proximate parcels" held in "common <br />ownership" as those terms are defined in WAC 173- <br />5394-030 and otherwise demonstrate how the <br />proposed new use will not violate RCW 90.44.050 as <br />currently existing or hereafter amended. Failure to <br />obtain mitigation before commencement of an activity <br />requiring mitigation shall be a code violation subject to <br />enforcement under Title l8 KCC. <br />All "proximate parcels" are held in <br />ownership by Blue Jay Land Company. As <br />this project is served by the Evergreen <br />Valley Water System this project is not in <br />violation of RCW 90.44.050. <br />Page 2 of I
The URL can be used to link to this page
Your browser does not support the video tag.