My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2025-134
>
Meetings
>
2025
>
07. July
>
2025-07-15 10:00 AM - Commissioners' Agenda
>
R2025-134
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2025 10:37:15 AM
Creation date
8/20/2025 10:36:25 AM
Metadata
Fields
Template:
Meeting
Date
7/15/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Resolution Granting Approval to Roslyn Ridge West Planned Unit Development (PD-24-00001), Short Plat (SP-24-00004) Final Development Plan
Order
12
Placement
Consent Agenda
Row ID
133196
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
density residential usg including multi-family and single family planned unit developments <br />and clustered housing. <br />9.1.3-1. Consistency Statement The planned unit development will utilize an existing <br />centralized water and sewer system and paved sfieets to support the higher density <br />residential use. <br />9.1.4.RR-G8: The County should shive to sustain and protect the westerly mountainous, <br />recreational open space, and its easterly non-resource agricultural and rangeland activities. <br />9.1,4.1. Consistency Statement The transfer of development rights from the 22 lots (96-91 <br />acres) in the northern area ofthe development into the southern area of the development <br />will allorv for the protection and conservation of those acres for open'space and <br />rerreation. <br />9.1.5.RR-G16: Allow for residential opportunity with rural character and a variety of densities <br />outside UGAs without population expeoting all urban services. <br />9.1.5.1. Consistency Statemenfi Up to 6l single family and/or muttiple-family residential <br />lots will be created on the lower 69.15 acres in Rural Recreation zone utilizing the <br />transfer of development rights from the upper 22 lots (96.91 aores) allowing the <br />developmont to maintain the rural character and meet the density requirements of Title <br />t7.30. <br />1 O. EIITYIROMI{EN:TAL REVIEW <br />i0.1. A critical area review was performed by stafi, and GIS data indicates a Type 9 <br />(unidentified) stream runnlng through parcels 950570,950583 8E 950584. The GIS data indicates <br />a Type 4 Seasonal (non-fish bearing) stream running through parcels 12065 and 202A2. The GIS <br />datalndicates a Critical AreaAquifer Recharge (CARA) for Group A Wellhead Protection Areas. <br />SEPA Checklist was submitted with the application and an MDNS was issued on November 14, <br />2024 <br />11. AGENCYAIID PUBLIC COMMENTS <br />11.1. Applicable agencies, adjacent property owners, and interested parties have been given the <br />opportunity to review this proposal. A variety of agencies and individuals commented on the <br />application. All comments were included in the record. <br />I1.2. Washington Depaxtment of Natural Resources: 'tsased on remote review of this parcel(s) <br />it appears that some or all ofthe parcel(s) consist of forestland, and it will require a Forest Practices <br />Appiication (FPA) from the DNR if merchantable timber is removed/harvested as pa$ of the <br />proposal and/or is being converted out of forest land (RCW 76.09 andWAC 222). The FPA would <br />need to meet the requirements of the Forest Practices Act and its rules. It is our recommendation <br />that the applicant meet with our local forest practices fortster to discuss, they may call our <br />SoutheastRegion office at (509) 925-8510 to schedule an appointnent'" <br />11.2.1. Applicant Response: This proposed project will require removal of timb€r throughout the <br />site as we prepare the land for the construction of homesites and necessary facilities. As <br />constmotion develops and as required by law, we will complete and submit a Forest Practices <br />Application. OurFPAwill meettherequirements oftheForestPracticesActand itsrules. We <br />will contaot the Southeast Region DNR office after approval of this project and upon the <br />beginning ofthe initial planning and constnrction process. <br />11.2.2. Hearing Examiner Finding: The SEPA Determination has been conditioned to meet the <br />requirements provided by Washington Departrnent ofNatural Resources. <br />PD-24-0000 1 /sP-24-00004 <br />Roslyn Ridge West <br />Page 6 of16
The URL can be used to link to this page
Your browser does not support the video tag.