Laserfiche WebLink
<br />2026-2031 Summary Page 19 <br /> <br /> <br />Repetitive Loss: <br />Easton Reach Flood <br />Study <br />Outreach informed by repetitive <br />loss area analysis and 2023 <br />Easton Reach Flood Hazard <br />Assessment. <br />Flood Control <br />Assistance <br />Account <br />Program <br />(FCAAP), <br />FCZD Levy. <br />Future phases <br />will be grant <br />eligible <br />2028-2029 $40,000 <br /> <br />CTP Flood Studies <br />Continued funding through <br />FEMA’s Cooperating Technical <br />Partnership (CTP) program to <br />improve flood models and <br />channel migration zone <br />mapping. 2027-2028 Wilson- <br />Naneum, 2029-2030 Manastash <br />flood and alluvial fan mapping <br />FEMA CPT <br />and local <br />funding <br />2027-2030 $275,000 <br />Lower Kittitas Reach <br />Floodplain <br />Reconnection <br />Implementation of preferred <br />alternative from Hanson Pits <br />Restoration Plan and Design. <br />2026- Final design and <br />permitting, 2027-2029- <br />Implementation, 2030-2031 <br />vegetation management. <br />SRFB, IP, FbD, <br />and local 2022-2031 $13,395,000 <br />Reecer Creek <br />Dolarway to <br />University <br />Project scheduled to be <br />completed by the City of <br />Ellensburg. If not completed <br />funding could be extended to <br />2026. <br />City of <br />Ellensburg 2025-2026 <br />WNC-Phase 3 <br />Whiskey Creek Re- <br />Route <br />Pending results of feasibility <br />study underway. 2026-2027 <br />Final design and permitting. <br />2028-2029 Implementation <br />Federal <br />Highways AOP <br />and local <br />2026-2031 $2,120,000 <br />Whisky Creek at <br />Ellensburg Water <br />Company (EWC) <br />Siphon <br />WNC. <br />Increase flood conveyance, <br />eliminate canal / creek <br />intermingling, and address fish <br />passage barrier by replacing <br />current EWC crossing at <br />Whiskey Creek with a siphon. <br />FCZD Levy, <br />Grant or partner <br />support for <br />construction <br />2026-2029 $1,780,000 <br /> <br />Flow Conveyance <br />Restoration- Mercer <br />Creek <br />MCF-KC Partnership. Mercer <br />at Helena project maintenance <br />and Mercer Creek west of <br />Railroad project design(2026) <br />Mercer Creek west of Railroad <br />Ave project permitting, <br />implementation and <br />maintenance. <br />Ecology 2026-2031 $272,000 <br />Flow Conveyance <br />Restoration- Whiskey <br />Creek <br />Inset floodplain and crack <br />willow removal between <br />Bowers and Bender Roads. <br />2026-Permitting. 2027 Phase 1 <br />construction. <br />Private, <br />Ecology 2026-2031 $380,000