My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026 - 2031 Six-Year Capital Improvement Plan - Final
>
Meetings
>
2025
>
08. August
>
2025-08-05 2:00 PM - 2:00pm Public Hearing
>
2026 - 2031 Six-Year Capital Improvement Plan - Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2025 12:05:55 PM
Creation date
7/31/2025 12:04:38 PM
Metadata
Fields
Template:
Meeting
Date
8/5/2025
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Public Hearing to Consider Approval of Updates to the 2026-2031 Capital Improvement Plan
Order
2
Placement
2:00pm Public Hearing
Row ID
133794
Type
Hold Public Hearing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Sanitary Sewer Page 136 <br /> <br />12. 13BSanitary Sewer <br />This section includes an inventory of Sanitary Sewer facilities and a detailed description of each <br />facility improvement that is included in the six-year plan. The inventory of facilities in Table 12 <br />below also describes each facility’s size in order to determine if it addresses the County’s long- <br />term community needs. <br /> <br /> <br />Table 12 <br />Existing Public Facilities and Services <br />Sanitary Sewer <br />Facility Provider Description Size <br />Ellensburg <br />treatment facilities <br />Dan Walker 509- <br />962-7277 <br />Kittitas County Utility <br />District <br /> <br />8m daily operating limit, peak <br />emergency capacity 15m. <br />General <br />sewer plan <br />update in <br />progress, <br />estimated <br />to be <br />completed <br />.2025. <br />Ronald treatment <br />facilities <br />Kittitas County Water <br />District No. 2 <br />Single lift station that conveys <br />wastewater flows from the Water <br />District area to the City of Roslyn <br />sewer system. <br />37 acres <br />Snoqualmie Pass <br />Utility District <br />thasting@snopass. <br />org <br />Snoqualmie Pass Utility <br />District <br />Average daily flow approximately <br />170000 mgd., permitted treatment and <br />discharge capacity of 0.368 mgd. and <br />storage of excess flows of about 30 <br />mill. Gal. Lagoon normal storage is <br />10.5 MG with an additional 10 MG <br />emergency storage. <br />MBR facility upgrade in 2026. Daily <br />operating flow 250,000 gpd & peak <br />flow 500,000 gpd. <br /> <br />General <br />sewer plan <br />online <br />(2019). <br />Projected <br />population <br />growth <br />1,581 by <br />2038 <br />Vantage <br />wastewater <br />collection and <br />treatment system <br />Vantage Water District <br />No. 6 <br />100,000 gpd daily operating limit. Working <br />on grant <br />to make <br />additions <br />and <br />improvem <br />ents. <br />Upper Kittitas <br />County Regional <br />Wastewater <br />Treatment Facility <br />City of Cle Elum Provides wastewater treatment to South <br />Cle Elum, City of Roslyn, City of <br />Ronald & Suncadia Resort.3.6 m daily <br />operating, instantaneous flow up to 10 <br />m. <br />Expected <br />service <br />capacity <br />of 18,956. <br />General <br />sewer plan
The URL can be used to link to this page
Your browser does not support the video tag.