Laserfiche WebLink
V. Feasibility and Risk Management <br />1. Feasibility <br />Plans are in hand and readyto be bid for start of construction. <br />2. Risk Management <br />Project will need to occur outside of winter weather and has therefore been planned for spring. <br />VI. Tourism Metrics and Success Measurement <br />The goal would be to complete design and construction of the signage during winter <br />(January- March) of 2026 with actual installation in April/May 2026. <br />The project will be promoted through the City website, Roslyn Historic Museum, and other <br />non-profit groups to promote the new experience. <br />There are 26 different cemeteries that date back to the early 1880's. The existing sprinkler <br />system has been in place since around the 50's and 60's and has been deteriorating. Due to <br />high risk of fire and maintenance and preservations needs for the location, a more robust <br />water system for these cemeteries is necessary to preserve the historic significance that <br />that these cemeteries contribute to the City of Roslyn and it's historic designation, which <br />includes these cemeteries. <br />The current kiosk at the site does track users as does the museum when providing <br />information to tourists. We expect to continue to use these tracking mechanisms moving <br />forward after project completion. <br />This project is expected to provide preservation and protection measures. <br />The City of Roslyn is committed to providing follow up data forthis project and trackingtourist <br />number to the site in order to better evaluate both the level of service being provide to the user and <br />future improvements that could increase that level of service to attract additional users to the site. <br />VII. Applicant Certification (Must be completed for application to be accepted) <br />I certify that the information provided in this application is true and complete to the best of my <br />knowledge. I further certify that I understand the eligibility requirements and that this project <br />complies with the requirements of RCW 67.28.1816. <br />