Laserfiche WebLink
11 <br /> <br />III. Budget and Funding <br />1. Project Budget Breakdown - The construction cost budget below was prepared by MACC <br />Estimating Group for our architects (ALSC Architects) in February 2024 and is adjusted to <br />reflect Q1 2025 costs. The details behind this summary are available here. <br /> <br />Foundations $ 549,607 <br />Superstructure 5,634,759 <br />Exterior Enclosure 3,569,910 <br />Roofing 2,045,863 <br />Interior Construction 1,134,503 <br />Stairs 223,053 <br />Interior Finishes 1,750,665 <br />Conveying Systems 93,000 <br />Plumbing 2,064,000 <br />HVAC 3,580,068 <br />Fire Protection 299,192 <br />Electrical 3,285,000 <br />Equipment 293,250 <br />Furnishings 446,411 <br />Special Construction 2,843,525 <br /> Building Construction Cost 27,812,806 <br /> <br />Site Preparation 637,774 <br />Site Improvements 2,856,892 <br />Site Mechanical Utilities 637,797 <br />Site Electrical Utilities 200,000 <br />Sitework Cost 4,332,463 <br />General Requirements (2.75%) 883,995 <br /> <br />Subtotal of Estimated Construction Cost $33,029,264 <br /> <br />Bonds and Insurance (1.25%) 412,866 <br />WA B&O Tax (0.5%) 165,146 <br />Overhead and Profit (2.75%) 908,305 <br />Contractor Fees 1,486,317 <br />Contingency (5%) 1,725,779 <br />Cost index to Q1 2025 (3.91%) 1,349,559 <br /> <br /> Total Estimated Bid Amount $37,590,919 <br /> <br />Soft Costs (30% of Construction Costs) 11,277,276 <br /> <br />Total Cost $52,168,195 <br />