Laserfiche WebLink
Page 2 of 2 <br />Auditor “Study Session Staff Report”, 7/24/2025 <br />• If we do not receive the funding we will not be able to get to 100% design and <br />permit phase which will hinder us in pursuing grants for the building <br />• We are asking for $40,000 to help support the costs for the permits so, our <br />target to break ground is the Spring of 2026 for the “Community Hub” in Cle <br />Elum. <br />• Below illustrates the funds that are necessary to complete the planning <br />stage of the project. <br />Admin conditional use permit $ 4,674.00 <br />Air conditioning permit (per unit) 140.00 <br />Appliance vent 40.00 <br />Boundary line adjustment/ survey 7,750.00 <br />Boundary Line adjustment 2,375.00 <br />Building permit (est) 5,500.00 <br />Demolition permit 230.00 <br />Fire suppression system fee (est) 2,000.00 <br />Furnace permit 140.00 <br />Hood vent 210.00 <br />M,E,P final design blueprints 150,000.00 <br />Permit issuance fee 150.00 <br />Pre application meeting 1,250.00 <br />Preliminary site eval 1,267.11 <br />Septic permit/design 2,128.00 <br /> $ 177,854.11 <br />Permits/needed services to <br />permit <br /> <br />Admin conditional use permit $ 4,674.00 <br />Air conditioning permit (per unit) 140.00 <br />Appliance vent 40.00 <br />Boundary line adjustment/ survey 7,750.00 <br />Boundary Line adjustment 2,375.00 <br />Building permit (est) 5,500.00 <br />Demolition permit 230.00 <br />Fire suppression system fee (est) 2,000.00 <br />Furnace permit 140.00 <br />Hood vent 210.00 <br />Permit issuance fee 150.00 <br />Pre application meeting 1,250.00 <br />preliminary site eval 1,267.11 <br />Septic permit/design 2,128.00 <br /> $ 27,854.11 <br /> <br /> <br />ATTACHMENTS: None