Laserfiche WebLink
Dept. of Public Works <br />Page 2 <br />Engineer The request scored 37 of the 35 points required to pursue a Speed Study. Public <br />Recommendation works believes a Speed Study would result in the engineering judgment required <br />to recommend a change in speed. <br />Date and Signatures <br />Note: A high score supports the petition. 35 points is typically needed for recommendation. 60 <br />point maximum. <br />411 N. Ruby St, Suite #1 TEL (509) 962-7523 <br />Ellensburg, WA 98926 FAX (509) 962-7663 <br />