My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Roslyn Ridge West PUD FDP Resolution & Attachment
>
Meetings
>
2025
>
07. July
>
2025-07-15 10:00 AM - Commissioners' Agenda
>
Roslyn Ridge West PUD FDP Resolution & Attachment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2025 12:13:48 PM
Creation date
7/10/2025 12:04:42 PM
Metadata
Fields
Template:
Meeting
Date
7/15/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Resolution Granting Approval to Roslyn Ridge West Planned Unit Development (PD-24-00001), Short Plat (SP-24-00004) Final Development Plan
Order
12
Placement
Consent Agenda
Row ID
133196
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOTE 4 — ROADS, DRIVEWAYS AND MAINTENANCE (KCC 17.36. 040 (2e): <br />DOUBLE O ROAD IS AN EXISTING ROAD AND SITS WITHIN A 50-FOOT <br />EASEMENT. BITTERROOT DRIVE IS AN EXISTING ROAD AND SITS WITHIN A 50 <br />FOOT EASEMENT. BITTERROOT DRIVE SHALL BE EXTENDED APPROXIMATLEY <br />250' WITHIN A 50-FOOT EASEMENT. A DRIVEWAY TO SERVE LOTS 4 AND 5 SHALL <br />BE CONSTRUCTED ON A 30-FOOT EASEMENT LOCATED ON LOT 6. BITTERROOT <br />LANE AND DOUBLE O ROAD MEET OR EXCEED THE CURRENT PRIVATE ROAD <br />STANDARDS. ROAD X THAT LINKS DOUBLE O ROAD TO ROCKBERRY LOOP <br />SHALL MEET OR EXCEED EXHIBIT J ATTACHED HERETO. ALL ROADS AND <br />DRIVEWAYS SHALL BE SURFACED WITH MATERIALS INCLUDING BUT NOT <br />LIMITED TO CRUSHED AGGREGATE WITH AN ESTIMATED COST OF $30 PER <br />SQUARE FOOT BASED ON 2025 COST CALCULATIONS. <br />NOTE 5 — COMMON OPEN SPACE (KCC 17.36. 040 (20): THERE ARE NO <br />PROPOSED COMMON OPEN SPACES TO BE CONSTRUCTED IN PHASES 1, 2 OR <br />3. IF IN THE FUTURE DEVELOPER WISES TO DESIGNATE OPEN OR <br />RECREATION SPACE IT WILL BE NOTED ON THE FINAL PLATT APPLICATION <br />NOTE 6 — FIRE PROTECTION FACILITIES (KCC 17.36. 040 (2g)): DOMESTIC <br />WATER AND FIRE FLOW IS PROVIDED BY THE EVERGREEN WATER SYSTEM <br />WHICH IS A GROUP A MUNICIPAL WATER SYSTEM THAT CURRENTLY SERVES <br />THE EXISTING ROSLYN RIDGE AND EVERGREEN VALLEY COMMUNITIES. <br />SERVICE LINES MAY BE CONSTRUCTED 5 FEET WITHIN THE DOUBLE O ROAD <br />EASEMENT AND THE LOT 6 EASEMENT. A FIRE HYDRANT SHALL BE PLACED ON <br />AN EASEMENT IN THE SOUTHWEST CORNER OF LOT 3 UNLESS INSTRUCTED <br />DIFFERENTLY BY THE LOCAL FIRE DEPARTMENT OR FIRE MARSHAL. THE FIRE <br />PROTECTION FOR PHASE 3 WILL BE SHOWN ON THE PHASE 3 FINAL PLAT. <br />NOTE 7 — STORM DRAINAGE PLAN (KCC 17.36. 040 (2h & a)): DOUBLE O ROAD IS <br />AN EXISTING ROAD WITH DRAINAGE CONTAINED IN A POORLY DEFINED DITCH <br />ON THE EASTERN SIDE OF THE ROAD. THIS DITCH WILL REMAIN IN ITS <br />CURRENT LOCATION AND BE IMPROVED TO HANDLE THE NEW RESIDENTIAL <br />USES. BITTERROOT DRIVE IS AN EXISTING ROAD THAT WILL BE EXTENDED TO <br />THE EAST. THE NEWLY DEVELOPED DRAINAGE DITCHES ON THE EXISTING <br />PORTION OF BITTERROOT DRIVE WILL BE EXTENDED TO THE END OF THE CUL- <br />DE-SAC. ALL STORMWATER AND DRAINAGE WILL BE ABSORBED THROUGH THE <br />GRAVEL ROAD SURFACE OR GRASS LINE DITCHES. A STORM WATER POND <br />WILL, IF NEEDED, BE CONSTRUCTED SOUTH OF THE PUD ON PROPERTY <br />OWNED BY THE DEVELOPER. <br />NOTE 8 — PUBLIC UTILITY EXTENSIONS: (KCC 17.36. 040 (2a)): PUBLIC WATER <br />AND SEWER EXTENSIONS ARE SHOWN ON THIS DRAWING. WATER AND <br />Exhibit I General Notes 4-18-2025 1151 <br />
The URL can be used to link to this page
Your browser does not support the video tag.