Laserfiche WebLink
PROJECT NAME Lower Valley Transfer Station <br />LOCATION OF WORK Admin, Scale House & Transfer Building- Toilets <br />PROJECT MANAGER Jasyn Erickson <br />REQUESTING PARTY Platinum Plumbing Services LLC <br />CHANGE REQUEST OVERVIEW <br />CLIENT Belsaas & Smith Construction Inc. <br />DATE OF REQUEST 3/31 /2025 <br />DESCRIPTION Swapping (4) WC-1 toilets to gravity tank toilets (Kohler K-3575). (1) in Transfer Building, <br />OF CHANGES <br />NEEDED (2) in Admin Building, (1) in Scale House. <br />1 " water mains currently servicing the Admin and Scale House buildings are not <br />REASON FOR CHANGE appropriately support riatel sized to the WC-1 toilets with flushometer valves. As a result, the <br />p <br />proposal is to replace all (4) water closets with gravity tank toilets. <br />SUPPORTS. The approved WC-1 with flushometers were already ordered, there will be re -stock <br />JUSTIFICATION and freight fee for the (4) flushometers. We have already roughed in the waste & <br />DOCUMENTS water on the admin and scale house buildings, so we will have to go back and re- <br />route water piping for the new Kohler toilets <br />SPECIFICATIONS <br />Price of (4) WC-1 w/ flushometers: $798.04 <br />Price of (4) WC-1 Gravity tank: $851.76 <br />ADDITIONAL Difference: $53.72 <br />INFORMATION Re -stock & freight fee for flushometers: $200 <br />Material price for re -working (3) toilet waters: $83.71 <br />Labor: (3 hrs.) $393.84 <br />CHANGE IN CONTRACT PRICE <br />CHANGE IN CONTRACT TIMES <br />ORIGINAL PRICE <br />$348,086.00 <br />ORIGINAL TIMES <br />NET CHANGES OF PREVIOUS <br />$349,889.72 <br />NET CHANGES OF PREVIOUS <br />CHANGE ORDERS <br />CHANGE ORDERS IN DAYS <br />NET INCREASE / DECREASE <br />+ $731.27 <br />NET INCREASE / DECREASE <br />TOTAL CONTRACT PRICE <br />$350,620.99 <br />TOTAL CONTRACT TIME <br />WITH APPROVED CHANGES <br />WITH APPROVED CHANGES <br />ACCEPTED BY APPROVED BY <br />SIGNATURE SIGNATURE <br />NAME & TITLE NAME & TITLE <br />DATE DATE <br />