Laserfiche WebLink
Rilev Eres <br />From: Rick Neil Jr <Richard.Neil@willscot.com> <br />Sent: Wednesday, March 26, 2025 2:36 PM <br />To: Riley Eres; Otis Lewis <br />Cc: Brandon Drexler <br />Subject: RE: Kittitas County Drawings <br />I just talked to my ramp provider, and he recommended just adding another 5x5 landing to door #2 and run the <br />ramp towards the front of the building. This option would cost $1,955. If you went with the switchback option it <br />would increase the cost $4,515. <br />Thanks, <br />RICK NEIL JR <br />o &k_' :vlu� lager - Special Sales <br />WILLSGOT <br />Office: 253.299.3660 <br />Cell: 253.266.5683 <br />Richard.NeiI@wil[scot.com <br />I <br />I <br />A 4.0 . <br />I <br />OPEN OFFICE <br />_ R/R o _ <br />SIMP CS16 WI (5) <br />10d EACH ENE). FROM <br />2 2 <br />-- <br />' I <br />STUD TO rLR RIM - TYP <br />ROOF S 4.3 S 4.2 FLOOR <br />r. I nj <br />rl <br />' Stair Stairs <br />l Landing <br />Landing <br />f} #1 <br />t*- +-e- <br />a' 4° <br />+' W --- _ <br />CL <br />Landing <br />#2 <br />30' Ramp <br />1 FLOOR PLAN <br />FLOOR JOIST LAYOUT STAR I FP FROM <br />1 /Q" W 1'-0" <br />GRID 7. SEE SHEET S2.0 FOR I LUMBING <br />BLOCK -OUT LOCATIONS <br />L.......... ___ <br />1 <br />