My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-05-13-minutes-solid-waste-and-maintenance
>
Meetings
>
2025
>
06. June
>
2025-06-17 10:00 AM - Commissioners' Agenda
>
2025-05-13-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2025 12:54:14 PM
Creation date
6/12/2025 12:49:56 PM
Metadata
Fields
Template:
Meeting
Date
6/17/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
132242
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1'° LJ1=C3M6 Harris Rebar Columbia Basin Inc. <br />HARRIS REBAR <br />CHANGE ORDER <br />Bid Item No.: Job No.: Job Description: Original C/O Date: <br />CO-001 16514688 Lower Valley Transfer Station 11/19/24 <br />Sell To: B 10298 <br />Belsaas & Smith Construction, Inc. <br />P.O. Box 926 <br />Ellensburg, WA 98926-9026 <br />USA <br />Change Order Description: <br />Add'l Reinfg for PEMB Reactions <br />Per S-SK-0 1 (dt. 11 -7-24) <br />Description <br />Change Order No.: <br />CO-001 <br />Revised C/O Date: <br />Type ouantity Unit price Line Amount <br />Furnish & Install Additional Reinfg Add <br />Freight Add <br />FURNISH & INSTALL ADDIL REINFIG FOR PEMB REACTIONS <br />Added Reinforcing for the MRW Building <br />Added (2)-#7 Slab Dowels per Column (12 columns total} <br />Per Contract Conditions & Exclusions <br />Per S-SK-0 1 (dt. 11 -7-2024) <br />issued By: Benjamin Davis Accepted By. Name: <br />Date: <br />1 LS <br />$871.31 <br />$871.31 <br />1 LS <br />$1,112.00 <br />$1,112.00 <br />Total: $1,983.31 <br />Addition To Contract <br />W14M PdrA) <br />(M"V-) <br />Harris Rebar Columbia Basin Inc. <br />PO BOX 575, Burbank, WA 99323, USA T. 509-547-2471 F. 509-547-1856 <br />Customer Copy <br />
The URL can be used to link to this page
Your browser does not support the video tag.