My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-05-13-minutes-solid-waste-and-maintenance
>
Meetings
>
2025
>
06. June
>
2025-06-17 10:00 AM - Commissioners' Agenda
>
2025-05-13-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2025 12:54:14 PM
Creation date
6/12/2025 12:49:56 PM
Metadata
Fields
Template:
Meeting
Date
6/17/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
132242
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BELSAAS <br />8c <br />SMITH <br />BELSASC0330H <br />January 29, 2025 <br />Re: Change Order Proposal #09 <br />P.O. BOX 926 / 103 EAST 4T" AVE, SUITE 209 <br />ELLENSBURG, WA 98926 <br />509-925-9747 <br />brandon@belsmith.com <br />Per the description below, we offer the following change order proposal #09 (COP#09). <br />COP 09 includes all labor, materials, and equipment necessary for encompassing the concrete <br />changes listed below. Attached is a sheet including all changed tasks with pricing and a <br />spreadsheet that breaks down the original bid cost to the new revised cost. <br />Total cost to be implemented into the contract <br />Time extension required: 0 days <br />Sincerely, <br />JL-- <br />Brandon Drexler, <br />Belsaas & Smith Construction <br />$ 280,980.58 + WSST <br />Less $233,662.44 Paid on Change Order No. 5 <br />$47,318.14 + WSST <br />
The URL can be used to link to this page
Your browser does not support the video tag.