Laserfiche WebLink
BELSAAS <br />8c <br />SMITH <br />BELSASC0330H <br />January 29, 2025 <br />Re: Change Order Proposal #09 <br />P.O. BOX 926 / 103 EAST 4T" AVE, SUITE 209 <br />ELLENSBURG, WA 98926 <br />509-925-9747 <br />brandon@belsmith.com <br />Per the description below, we offer the following change order proposal #09 (COP#09). <br />COP 09 includes all labor, materials, and equipment necessary for encompassing the concrete <br />changes listed below. Attached is a sheet including all changed tasks with pricing and a <br />spreadsheet that breaks down the original bid cost to the new revised cost. <br />Total cost to be implemented into the contract <br />Time extension required: 0 days <br />Sincerely, <br />JL-- <br />Brandon Drexler, <br />Belsaas & Smith Construction <br />$ 280,980.58 + WSST <br />Less $233,662.44 Paid on Change Order No. 5 <br />$47,318.14 + WSST <br />